[1]
|
J. Portas and S. AbouRizk, “Neural Network Model for Estimating Construction Productivity,” Journal of Con struction Engineering and Management, Vol. 123, No. 4, 1997, pp. 399-410.
doi:10.1061/(ASCE)0733-9364(1997)123:4(399)
|
[2]
|
D. Arditi, O. B. Tokdemir and K. Suh, “Effect of Learn ing-of-Balance Scheduling,” International Journal of Pro ject Management, Vol. 19, No. 5, 2001, pp. 265-277.
doi:10.1016/S0263-7863(99)00079-4
|
[3]
|
D. G. Proverbs, G. D. Holt and P. O. Olomolaiye, “A Comparative Evaluation of Planning Engineers’ Form work Productivity Rates in European Construction,” Build ing and Environment, Vol. 33, No. 4, 1998, pp. 181-187.
doi:10.1016/S0360-1323(97)00035-8
|
[4]
|
J. Christian and D. Hachey, “Effects of Delay Times on Production Rates in Construction,” Journal of Construc tion Engineering and Management, Vol. 121, No. 1, 1995, pp. 20-26.
doi:10.1061/(ASCE)0733-9364(1995)121:1(20)
|
[5]
|
A. Kazaz and S. Ulubeyli, “A Different Approach Tocon struction Labour in Turkey: Comparative Productivity Analysis,” Building and Environment, Vol. 39, No. 1, 2004, pp. 93-100. doi:10.1016/j.buildenv.2003.08.004
|
[6]
|
C. H. Oglesby, H. W. Parker and G. A. Howell, “Produc tivity Improvement in Construction,” McGraw-Hill Book Co., New York, 1989.
|
[7]
|
R. Sonmez and J. E. Rowings, “Construction Labor Pro ductivity Modeling with Neural Networks,” Journal of Construction Engineering and Management, Vol. 124, No. 6, 1998, pp. 498-504.
doi:10.1061/(ASCE)0733-9364(1998)124:6(498)
|
[8]
|
J. C. Kellogg, G. E. Howell and D. C. Taylor, “Hierarchy Model of Construction Productivity,” Journal of the Con struction Division, Vol. 107, No. 1, 1981, pp. 137-152.
|
[9]
|
Business Roundtable, “Construction Productivity Meas urement,” Report No. A-1, Business Roundtable, New York, 1982.
|
[10]
|
H. R. Thomas and I. Yiakoumis, “Factor Model of Con struction Productivity,” Journal of Construction Engi neering and Management, Vol. 113, No. 4, 1987, pp. 626-639.
doi:10.1061/(ASCE)0733-9364(1987)113:4(623)
|
[11]
|
H. R. Thomas, W. F. Maloney, R. M. W. Horner, G. R. Smith, V. K. Handa and S. R. Sanders, “Modeling Con struction Labor Productivity,” Journal of Construction Engineering and Management, Vol. 116, No. 4, 1990, pp. 705-726.
doi:10.1061/(ASCE)0733-9364(1990)116:4(705)
|
[12]
|
J. D. Borcherding, “Improving Productivity in Industrial Construction,” Journal of the Construction Division, Vol. 102, No. 4, 1976, pp. 599-613.
|
[13]
|
J. D. Borcherding, S. J. Sebastian and N. M. Samelson, “Improving Motivation and Productivity on Large Pro jects,” Journal of the Construction Division, Vol. 106, No. 1, 1980, pp. 73-89.
|
[14]
|
W. F. Maloney, “Productivity Improvement: The Influ ence of Labor,” Journal of Construction Engineering and Management, Vol. 109, No. 3, 1983, pp. 321-334.
doi:10.1061/(ASCE)0733-9364(1983)109:3(321)
|
[15]
|
C. H. Oglesby, H. W. Parker and G. A. Howell, “Produc tivity Improvement in Construction,” McGraw-Hill, Inc., New York, 1989.
|
[16]
|
R. D. Logcher and W. C. Collins, “Management Impacts on Labor Productivity,” Journal of the Construction Divi sion, Vol. 104, No. 4, 1978, pp. 447-461.
|
[17]
|
H. R. Thomas, V. E. Sanvido and S. R. Sanders, “Impact of Material Management on Productivity—A Case Study,” Journal of Construction Engineering and Management, Vol. 115, No. 3, 1989, pp. 370-384.
doi:10.1061/(ASCE)0733-9364(1989)115:3(370)
|
[18]
|
C. W. Ibbs and W. E. Allen, “Quantitative Impacts of Project Change,” Source Document 108, Construction Industry Institute, University of Texas at Austin, 1995.
|
[19]
|
C. W. Ibbs, “Quantitative Impacts of Project Change: Size Issues,” Journal of Construction Engineering and Management, Vol. 123, No. 3, 1997, pp. 308-311.
doi:10.1061/(ASCE)0733-9364(1997)123:3(308)
|
[20]
|
A. S. Hanna, J. S. Russell, T. W. Gotzion and E. V. Nord heim, “Impact of Change Orders on Labor Efficiency for Mechanical Construction,” Journal of Construction En gineering and Management, Vol. 125, No. 3, 1999, pp. 176-184.
doi:10.1061/(ASCE)0733-9364(1999)125:3(176)
|
[21]
|
H. R. Thomas, D. R. Riley and V. E. Sanvido, “Loss of Labor Productivity Due to Delivery Methods and Wea ther,” Journal of Construction Engineering and Man agement, Vol. 125, No. 1, 1999, pp. 39-46.
doi:10.1061/(ASCE)0733-9364(1999)125:1(39)
|
[22]
|
W. Ibbs, “Impact of Change’s Timing on Labor Produc tivity,” Journal of Construction Engineering and Man agement, Vol. 131, No. 11, 2005, pp. 1219-1229.
doi:10.1061/(ASCE)0733-9364(2005)131:11(1219)
|
[23]
|
A. S. Hanna, C. K. Chang, J. A. Lackney and K. T. Sulli van, “Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity,” Journal of Construction En gineering and Management, Vol. 133, No. 1, 2007, pp. 22-28. doi:10.1061/(ASCE)0733-9364(2007)133:1(22)
|
[24]
|
H. R. Thomas, C. T. Mathews and J. G. Ward, “Learning Curve Models of Construction Productivity,” Journal of Construction Engineering and Management, Vol. 112, No. 2, 1986, pp. 245-258.
doi:10.1061/(ASCE)0733-9364(1986)112:2(245)
|
[25]
|
J. G. Everett and S. Farghal, “Learning Curve Predictors for Construction Field Operations,” Journal of Construc tion Engineering and Management, Vol. 120, No. 3, 1994, pp. 603-616.
doi:10.1061/(ASCE)0733-9364(1994)120:3(603)
|
[26]
|
J. P. Couto and J. C. Teixeira, “Using Linear Model for Learning Curve Effect on Highrise Floor Construction,” Construction Management & Economics, Vol. 23, No. 4, 2005, pp. 355-364. doi:10.1080/01446190500040505
|
[27]
|
A. M. Jarkas, “Critical Investigation into Applicability of the Learning Curve Theory to Rebar Fixing Labor Pro ductivity,” Journal of Construction Engineering and Ma nagement, Vol. 136, No. 12, 2010, pp. 1279-1288.
doi:10.1061/(ASCE)CO.1943-7862.0000236
|
[28]
|
A. M. Jarkas and M. Horner, “Revisiting the Applicabil ity of Learning Curve Theory to Formwork Labour Pro ductivity,” Construction Management & Economics, Vol. 29, No. 5, 2011, pp. 483-493.
doi:10.1080/01446193.2011.562911
|
[29]
|
H. R. Thomas and I. Zavrski, “Construction Baseline Productivity: Theory and Practice,” Journal of Construc tion Engineering and Management, Vol. 125, No. 5, 1999, pp. 295-303.
doi:10.1061/(ASCE)0733-9364(1999)125:5(295)
|
[30]
|
H. R. Thomas and V. E. Sanvido, “Quantification of Losses Caused by Labor Inefficiencies: Where Is the Elu sive Measured Mile?” Construction Law and Business, Vol. 1, No. 3, 2000, pp. 1-14.
|
[31]
|
W. Ibbs and M. Liu, “Improved Measured Mile Analysis Technique,” Journal of Construction Engineering and Management, Vol. 131, No. 12, 2005, pp. 1249-1256.
doi:10.1061/(ASCE)0733-9364(2005)131:12(1249)
|
[32]
|
L. D. Nguyen and W. Ibbs, “Case Law and Variations in Cumulative Impact Productivity Claims,” Journal of Con struction Engineering and Management, Vol. 136, No. 8, 2010, pp. 826-833.
doi:10.1061/(ASCE)CO.1943-7862.0000193
|
[33]
|
N. Al-Taweel and M. A. Saeed, “Measuring Standard Times for Labors Productivity for a Number of Different Work Items,” Journal in Engineering and Technology, Vol. 10, No. 2, 2005, 1991, pp. 249-256.
|
[34]
|
A. J. Tahar, “Studying Labour Productivity for Some Working Items in Construction Projects,” Msc. Thesis, University of Technology, Iraq, 1995.
|
[35]
|
A. Abd-allah, “Effect of Wages and Incentives on Labours Productivity in Construction Sector in Iraq,” Master Thesis, University of Technology, Iraq, 1999.
|
[36]
|
F. M. S. Al-Zwainy, “The Use of Artificial Neural Networks for Productivity Estimation of finishing Stone Works for Building Projects,” Journal of Engineering and Development, Vol. 16, No. 2, 2012, pp. 42-60.
http://www.iasj.net/iasj?func=fulltext&aId=68252
|
[37]
|
F. M. S. Al-Zwainy, A. R. Hatem and F. I. Huda, “Using Artificial Neural Network for Finishing Works for Floors with Marble,” ARPN Journal of Engineering and Applied Sciences, Vol. 7, No. 6, 2012, pp. 714-722.
http://www.arpnjournals.com/jeas/research_papers/rp_2012/jeas_0612_714.pdf
|
[38]
|
R. V. Hogg and J. Ledolter, “Applied Statistics for Engineers and Physical Scientists,” 2nd Edition, Macmillan, New York, 1992.
|
[39]
|
S. D. Smith, “Earthmoving Productivity Using Linear Re gression Techniques,” Journal of Construction Engineering and Management, Vol. 125, No. 3, 1999, pp. 133-141. doi:10.1061/(ASCE)0733-9364(1999)125:3(133)
|
[40]
|
A. Makulsawatudom and M. Emsley, “Critical Factors Influencing Construction Productivity in Thailand,” Jour nal of KMITNB, Vol. 14, No. 3, 2004, pp. 1-6.
|
[41]
|
B. N. Gupta, “An Introduction to Modern Statistics,” Indian Institution of Public Administration, New Delhi, 1973.
|