Willingness to Pay for Improved Electricity Supply in Ghana

Abstract

One major problem facing Ghana is the unreliable supply of electricity. Unreliable electricity supply largely attributed to supply side constraints such as poor energy infrastructure, low tariffs which is below cost recovery and increasing demand has made it difficult to provide uninterrupted supply for the populace. Currently, there is a constant outcry by Ghanaians for the government and service providers to improve electricity service delivery due to the fact that households do suffer economic losses in the event of unannounced power outages to the point that many of them may be willing to pay higher tariffs if that will ensure improved service delivery. In this study we assess households’ willingness to pay (WTP) for improved electricity supply as well as the factors that influence WTP through a contingent valuation survey. Results from our analysis indicated that, households in Ghana are prepared to pay on the average about 0.2734 for a kilowatt-hour which is about one and a half times more than what they are paying currently. An econometric analysis of the factors that influence households’ WTP for improved electricity supply indicates that household income, sex, household size, secondary and tertiary level education are the significant factors.

Share and Cite:

Twerefou, D. (2014) Willingness to Pay for Improved Electricity Supply in Ghana. Modern Economy, 5, 489-498. doi: 10.4236/me.2014.55046.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Brown, K., Pearce, D., Perrings, C. and Swanson, T. (1993) Economics and the Conservation of Global Biological Diversity. Global Environment Facility, World Bank, Washington DC.
[2] Serra, P. and Fierro, G. (1997) Outage Costs in Chilean Industry. Energy Economics, 19, 417-434.
http://dx.doi.org/10.1016/S0140-9883(97)01017-7
[3] Carlsson, F. and Martinsson, P. (2004) Willingness to Pay among Swedish Households to Avoid Power Outages. Working Papers in Economics No. 154.
[4] Adenikinju, A. and Center for Economics and Allied Research (2005) Analysis of the Cost of Infrastructure Failures in a Developing Economy: The Case of the Electricity Sector in Nigeria. AERC Research Paper 148.
[5] Damigos, D., Tourkolias, C. and Diakoulaki, D. (2009) Households’ Willingness to Pay for Safeguarding Security of Natural Gas Supply in Electricity Generation. Energy Policy, 37, 2008-2017.
http://dx.doi.org/10.1016/j.enpol.2009.01.042
[6] Kateregga, E. (2009) The Welfare Costs of Electricity Outages: A Contingent Valuation Analysis of Households in the Suburbs of Kampala, Jinja and Entebbe. Journal of Development and Agricultural Economics, 1, 1-11.
[7] McNair, B.J., Bennett, J., Hensher, D.A. and Rose, J.M. (2011) Households’ Willingness to Pay for Overhead-to-Underground Conversion of Electricity Distribution Networks. Energy Policy, 39, 2560-2567.
http://dx.doi.org/10.1016/j.enpol.2011.02.023
[8] Hanley, N., Shogren, J.F. and White, B. (2002) Environmental Economics in Theory and Practice. Palgrave MacMillan, New York.
[9] Cranfield, J.A.L. and Magnusson, E. (2003) Canadian Consumer’s Willingness-to-Pay for Pesticide Free Food Products: An Ordered Probit Analysis. International Food and Agribusiness Management Review, 6, 13-30.
[10] Greene, W.H. (2008) Econometrics Analysis. 6th Edition, Prentice Hall, New Jersey.
[11] Abdullah, S. and Mariel, P. (2010) Choice Experiment Study on the Willingness to Pay to Improve Electricity Services. Energy Policy, 38, 4570-4581.
http://dx.doi.org/10.1016/j.enpol.2010.04.012
[12] Appau-Danso, E. (2004) Willingness to Pay for Improved Water Supplies in Rural Communities. A Case Study of the Asante Akim South District. An Unpublished MPhil Thesis, University of Ghana, Legon.
[13] Adjei, P.O. (1999) Willingness to Pay for Improved Water Services: Contingent Valuation Method for Greater Accra Metropolitan Area. An Unpublished MPhil Thesis, University of Ghana, Legon.
[14] Calkins, P., Larue, B. and Vézina, M. (2002) Willingness to Pay for Drinking Water in the Sahara: The Case of Douentza in Mali. Cahiers d’économie et Sociologie Rurales, 64, 37-56.
[15] Fissha, M. (2006) Household Demand for Improved Water Service in Urban Areas: The Case of Addis Ababa, Ethiopia. Unpublished MSc. Thesis, Addis Ababa University, Addis Ababa.
[16] Engel, S., Iskandarani, M. and Usache, M.P. (2005) Improved Water Supply in the Ghanaian Volta Basin: Who Uses It and Who Participates in Community Decision Making? IFPRI, EPT Discussion Paper, No. 129.

Copyright © 2023 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.