Identification of the Causes of Deadline Slippage in Construction Projects: State of the Art and Application

Abstract

This study aims at analysing the causes assessment of deadline slippage in construction projects accomplished on the international level. It also identifies the said causes on the projects completed in Morocco in order to develop and put in place an adjusted modelling framework. The literature concerning this field has been examined during the last decade. A quantitative analysis of deadlines risks of sample of real estate project has been done in different regions of Morocco. This analysis has helped to identify and rank the delay causes while determining their frequency of occurrence their impact as well as their relative importance by combining two processes: macroscopic "Top-down" and microscopic "Bottom-down". In comparison with the previous research which was solely based on the first process, this method has specified an objective and exhaustive list of most causes. Three high-risk causes have been identified: the initial budget assessment, volatility of the architecture and engineering program and construction site hazards.

Share and Cite:

A. Challal and M. Tkiouat, "Identification of the Causes of Deadline Slippage in Construction Projects: State of the Art and Application," Journal of Service Science and Management, Vol. 5 No. 2, 2012, pp. 151-159. doi: 10.4236/jssm.2012.52019.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] S. A. Assaf and S. Al-Hejji, “Causes of Delay in Large Construction Projects,” International Journal of Project Management, Vol. 24, 2006, pp. 349-357.
[2] J. O. Ajanlekoko, “Controlling Cost in the Construction Industry,” Lagos QS Digest, Vol. 1, No. 1, 1987, pp. 8- 12.
[3] H. A. Odeyinka and A. Yusif, “The Causes and Effects of Construction Delays on Completion Cost of Housing Projects in Nigeria,” Journal of Financial Management of Property and Construction, Vol. 2, No. 3, 1997, pp. 31- 44.
[4] D. W. Chan and M. M. Kumaraswamy, “A Comparative Study of Causes of Time Overruns in Hong Kong Construction Projects,” International Journal of Project Management, Vol. 15, No. 1, 1997, pp. 55-63. doi:10.1016/S0263-7863(96)00039-7
[5] Z. Hatush and M. Skitmore, “Evaluating Contractor Prequalification Data: Selection Criteria and Project Success Factors,” Construction Management and Economics, Vol. 15, No. 2, 1997, pp. 129-147. doi:10.1080/01446199700000002
[6] W. Belassi and O. I. Tukel, “A New Framework for Determining Critical Success/Failure Factors in Projects,” International Journal of Project Management, Vol. 14, No. 3, 1996, pp. 141-151. doi:10.1016/0263-7863(95)00064-X
[7] D. H. T. Walker, “An Investigation into Construction Time Performance”, Construction Management and Economics, Vol. 13, No. 3, 1995, pp. 263-274. doi:10.1080/01446199500000030
[8] D. H. T. Walker, “The Contribution of the Construction Management Team to good Construction Time Performance—An Australian Experience,” Journal of Construction Procurement, Vol. 2, No. 2, 1996, pp. 4-18.
[9] A. S. Faridi and S. M. El-Sayegh, “Significant Factors Causing Delay in the UAE Construction Industry,” Construction Management and Economics, Vol. 24, No. 11, 2006, pp. 1167-1176. doi:10.1080/01446190600827033
[10] A. A. Albinu and G. O. Jagboro, “The Effects of Construction Delays on Project Delivery in Nigerian Construction Industry,” International Journal of Project Management, Vol. 20, 2002, pp. 593-599.
[11] A. G. Ubaid, “Factors Affecting Contractor Performance,” Master’s Thesis, King Fahd University of Petroleum and Minerals, Dhahran, 1991.
[12] S. A. Assaf, M. Al-Khalil and M. Al-Hazmi, “Causes of Delays in Large Building Construction Projects,” Journal of Management in Engineering, Vol. 11, No. 2, 1995, pp. 45-50. doi:10.1061/(ASCE)0742-597X(1995)11:2(45)
[13] M. Kumaraswamy and D. Chan, “Contributors to Construction Delay,” Construction Management and Economics, Vol. 16, No. 1, 1998, pp. 17-29. doi:10.1080/014461998372556
[14] P. Kaming, P. Olomolaiye, G. Holt and F. Harris, “Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia,” Construction Management and Economics, Vol. 15, No. 1, 1997, pp. 83-94. doi:10.1080/014461997373132
[15] A. Noulmanee, J. Wachirathamrojn, P. Tantichattanont and P. Sittivijan, “Internal Causes of Delays in Highway Construction Projects in Thailand,” 1999. www.ait.c1et.com, July.
[16] A. H. Al-Momani, “Construction Delay: A Quantitative Analysis,” International Journal of Project Management, Vol. 18, No. 1, 2000, pp. 51-59. doi:10.1016/S0263-7863(98)00060-X
[17] S. Meeampol and S. O. Ogunlana, “Factors Affecting Cost and Time Performance on Highway Construction Projects: Evidence from Thailand,” Journal of Financial Manage- ment of Property and Construction, Vol. 11, No. 1, 2006, pp. 3-20. doi:10.1108/13664380680001076
[18] M. Sambasivan and Y. W. Soon, “Causes and Effects of Delays in Malaysian Construction Industry,” International Journal of Project Management, Vol. 25, 2007, pp. 517- 526.
[19] L. Le-Hoai, Y. D. Lee and J. Y. Lee, “Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries,” Journal of Civil Engineering, Vol. 12, No. 6, 2008, pp. 367-377.
[20] T. Pourrostam and A. Ismail, “Significant Factors Causing and Effects of Delay in Iranian Construction Projects,” Australian Journal of Basic and Applied Sciences, Vol. 5, No. 7, 2011, pp. 450-456.
[21] S. U. R. Toor and S. O. Ogunlana, “Problems Causing Delay in Major Construction Projects in Thailand,” Construction Management and Economics, Vol. 26, No. 4, 2008, pp. 395-408. doi:10.1080/01446190801905406
[22] S. Al H. Tumi, A. Omran and A. H. K. Pakir, “Causes of Delay in Construction Industry in Libya,” The International Conference on Economics and Administration, Faculty of Administration and Business, Bucharest, 14-15 November 2009, pp. 265-272.
[23] H. Afshari, S. Khosravi, A. Ghorbanali, M. Borzabadi and M. Valipour, “Identification of Causes of Non-Excusable Delays of Construction Projects,” International Conference on E-Business Management and Economics, Hong Kong, 28-30 December 2010, pp. 42-46.
[24] M. Haseeb, X. H. Lu, A. Bibi, Maloof-ud-Dyian, W. Rabbani, “Causes and Effects of Delays in Large Construction Projects of Pakistan,” Kuwait Chapter of Arabian Journal of Business and Management Review, Vol. 1, No. 4, 2011, pp. 18.-42.
[25] S. O. Ogunlana, K. Promkuntong and V. Jearkjirm, “Construction Delays in a Fast-Growing Economy: Comparing Thailand with Other Economies,” International Journal of Project Management, Vol. 14, No. 1, 1996, pp. 37-45. doi:10.1016/0263-7863(95)00052-6
[26] Y. Frimponga, J. Oluwoyeb and L. Crawfordc, “Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries, Ghana as a Case Study,” International Journal of Project Manage- ment, Vol. 21, No. 5, 2003, pp. 321-326.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.