Share This Article:

SOMS: A Subway Operation and Maintenance System Based on Planned Maintenance Model with Train State

Full-Text HTML Download Download as PDF (Size:895KB) PP. 195-202
DOI: 10.4236/jilsa.2013.54021    4,247 Downloads   6,608 Views Citations

ABSTRACT

This paper aims to propose a modeling framework for subway operation and maintenance system (SOMS), which analyzes the train condition data based on both train sensor network data and basis train maintenance plan. The system is formulated into five function modules, and the research problem is to determine one auxiliary maintains plan, including the time allocation and frequency of maintenance. The case of Guangzhou metro is conducted to illustrate the applicability of SOMS, and the results reveal a number of interesting insights into subway maintenance system, i.e., the worksheet can reduce duplication of redundant maintenance work, the repair cost, and the damage caused by frequent disassembly.

Cite this paper

J. Ding, Y. Qin, L. Jia, S. Zhu and B. Yu, "SOMS: A Subway Operation and Maintenance System Based on Planned Maintenance Model with Train State," Journal of Intelligent Learning Systems and Applications, Vol. 5 No. 4, 2013, pp. 195-202. doi: 10.4236/jilsa.2013.54021.

Copyright © 2019 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.