Approach for Cost Determination of Electro-Mechanical Equipment in Ror Shp Projects
Sachin Mishra, Sunil Kumar Singal, Dheeraj Kumar Khatod
.
DOI: 10.4236/sgre.2011.22008   PDF    HTML   XML   14,250 Downloads   31,658 Views   Citations

Abstract

Electricity is one of the most widely used forms of energy. Being a renewable source of energy small hydropower is considered as an environment—friendly and cheap source of electricity. The installation cost of the small hydropower project depends mainly on two parts—civil works and electromechanical equipment. One of the most important element on the recovery of a small hydro-power plant is the electromechanical equipment (turbine-alternator). The present paper intends to develop a correlation to determine the cost based on the cost influencing parameters as power and head using three different methods, namely; sigma plot method, linest method and logest method. An attempt has also been made to identify the best correlation among the three models closer to the actual cost of electro-mechanical equipment as collected from recently developed projects.

Share and Cite:

S. Mishra, S. Singal and D. Khatod, "Approach for Cost Determination of Electro-Mechanical Equipment in Ror Shp Projects," Smart Grid and Renewable Energy, Vol. 2 No. 2, 2011, pp. 63-67. doi: 10.4236/sgre.2011.22008.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] “Guidelines for Development of Small Hydro Electric Scheme,” CEA, Government of India, New Delhi, 1982.
[2] B. S. K. Naidu, “Small Hydro,” NPTI Publication, Faridabad, 2005.
[3] P. S. Nigam, “Hand Book of Hydro Electric Engineering,” Nem Chand and Brothers, Roorkee, 1985.
[4] J. S. Anagnostopoulos and D. E. Papantonis, “Optimal Sizing of a Run-of-River Small Hydropower Plant,” Energy Conversion and Management, Vol. 48, No. 10, 2007, pp. 2663-2670. doi:10.1016/j.enconman.2007.04.016
[5] S. K. Singal and R. P. Saini, “Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes,” Proceedings of International Conference on Small Hydropower, Sri Lanka, 22-24 October 2007, pp. 1-6.
[6] B. Ogayar and P. G. Vidal, “Cost Determination of the Electro-Mechanical Equipment of a Small Hydro-Power Plant,” Journal of Renewable Energy, Vol. 34, No. 1, 2009, pp. 6-13. doi:10.1016/j.renene.2008.04.039
[7] S. K. Singal, R. P. Saini and C. S. Raghuvanshi, “Analysis for Cost Estimation of Low Head Run-of-River Small Hydropower Scheme,” Journal of Energy for Sustainable Development, Vol. 14, No. 2, 2010, pp. 117-126.
[8] G. A. Aggidis, E. Luchinskaya, R. Rothschild and D. C. Howard, “The Costs of Small-Scale Hydro Power Production: Impact on the Development of Existing Potential,” Journal of Renewable Energy, Vol. 35, No. 12, 2010, pp. 2632-2638. doi:10.1016/j.renene.2010.04.008
[9] S. Mishra, S. K. Singal and D. K. Khatod, “Costing of Small Hydropower Projects,” Proceedings of International Conference on Prudent Development and Renewable Energy Resources, Chennai, 19-20 February 2011, pp. 22-25.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.