The Reliability Evaluation Method Study of Power System Communication Networks in Case of Ice Storm

Abstract

This paper is divided into two cases to study the communication transmission equipment reliability in the state of the ice storm, according to the huge losses of power system communication caused by the ice storm. For the nodes or links which are not affected by the ice storm, we use the calculation with “the mean time between failures (MTBF)” and “the mean time to repair” (MTTR) to put forward the calculation methods; for the OPGW cable which influenced greater in ice storm, we use the fiber excess length and the elongation of fiber optic cable. It obtains all the paths of the network through improved adjacency matrix method, and then it uses binary decision diagram to obtain the overall reliability of the network. By testing the network nodes and links using “N-1” inspection, the key nodes and key links can be obtained. Finally, considering the importance degree of network transmission business, the reliability evaluation method of power system communication network based on the risk theory in the case of the ice storm has been put forward, and the example to verify that the method can provide the basis for the reliability assessment of the power system communication in the case of the ice storm has been given.

Share and Cite:

J. Yang, H. Teng, C. Yao, N. Liu, B. Sun, H. Yuan, M. Liu and J. Bai, "The Reliability Evaluation Method Study of Power System Communication Networks in Case of Ice Storm," Engineering, Vol. 5 No. 9B, 2013, pp. 30-36. doi: 10.4236/eng.2013.59B006.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] L. J. Qin and Q. Y. Ma. “Intelligent Distribution Network and Its Key Technology,” China Electric Power Press, Beijing, 2010.
[2] X. F. Xiong, J. J. Tian, J. Q. Zhou, et al., “Reliability Model Research of Electric Power Communication System,” Relay, Vol. 35, No. 14, 2007, pp. 28-32.
[3] Y. Zeng, “Power Communication Network Reliability Analysis and Evaluation Methods,” Telecommunication for Electric Power System, Vol. 32, No. 226, 2011, pp. 13-16.
[4] Q. Gao, X. W. Liu and L. J. Qiu, “Emergency Communication Network in Power System and Its Invulnerability Analysis,” Power System Technology, Vol. 33, No. 11, 2009, pp. 104-108.
[5] Y. Hu, M. C. Dong and Y. D. Han, “Consideration of Information Security for Electric Power Industry,” Automation of Electric Power Systems, Vol. 4, No. 10, 2002, pp. 1-4.
[6] X. Yuan, “Discussion on Construction of Emergency Communication Network in Guizhou Power Grid,” Telecommunication for Electric Power System, Vol. 30, No. 196, 2009, pp. 37-41.
[7] N. Z. Xing and H. F. Yan, “Research on the Reliability of Electric Power Telecommunication System,” Telecommunication for Electric Power System, Vol. 28, No. 176, 2007, pp. 26-30.
[8] A. H. Mohamed, K. Nicholas and H. Sayed, “Towards a Standardized Terminology for Network Performance,” IEEE Transactions on Reliability, Vol. 57, No. 2, 2008, pp. 267-271. http://dx.doi.org/10.1109/TR.2008.920800
[9] P. Deng, X. Peng, L. F. Tian, et al., “Survivability Analysis of Power System Information Network Bases on Connectivity,” Engineering Journal of Wuhan University, Vol. 43, No. 6, 2010, pp. 792-795.
[10] X. X. Li, W. Zheng and Q. Liu, “Program Development on Index Evaluation for Inherent Reliability,” Electronic Communications and Control (ICECC), 2011, pp. 3844-3847.
[11] X. H. Chen, J. H. Huang, J. M. Zhang, et al., Telecommunication for Electric Power System, Vol. 29, No. 191, 2008, pp. 8-13.
[12] J. A. Dzekevich and J. Garretson, “A Design Margin Index for MTBF and Ao,” Reliability and Maintainability Symposium, Vol. 22, No. 25, 2007, pp. 288-291.
[13] W. A. Chisholm, J. P. Levine and P. Chowdhuri, “Lightning Arc Damage to Optical Fiber Ground Wires (OPGW): Parameters and Test Methods,” Power Engineering Society Summer Meeting, Vol. 1, No. 1, 2001, pp. 88-93.
[14] R. X. Liu, J. H. Zhang and D. Wu, “Research on Static Security Index of Distribution Network Based on Risk Theory,” Power System Protection and Control, Vol. 39, No. 15, 2011, pp. 89-95.
[15] W. H. Chen, Q. Y. Jiang and Y. J. Cao, “Risk Assessment of Power System Cascading Failure Considering Hidden Failures of Protective Relayings,” Power System Technology, Vol. 30, No. 13, 2006, pp. 14-19.
[16] Y. Zhou, B. X. Zhou and Y. Xing, “Graphical Power Network Topology Analysis Based on Adjacengcy Matrix,” Power System Protection and Control, Vol. 37, No. 17, 2009, pp. 49-52.
[17] F. S. Dai, “Ob-jective Evaluation Method of Significance of Nodes Links in Communication Network,” Journal of Nanjing University of Science and Technology, Vol. 30, No. 6, 2006, pp. 748-753.
[18] Y. F. Shi, N. Lu and H. M. Li, “An Algorithm of Network System Reliability Based on an Improved Disjointed Minimal Path Set,” Computer Engineering and Science, Vol. 33, No. 1, 2011, pp. 30-35.
[19] D. K. Li, “New Algorithm for Computing Network System Reliability,” Communications Technology, Vol. 42, No. 11, 2009, pp. 149-151.
[20] M. Q. Wang, H. B. Yu and H. Wang, “Overview on the Research of Binary Decision Diagrams Optimization,” Information and Control, Vol. 33, No. 5, 2004, pp. 567-572.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.