Study on Factors Influencing the Reliability of the Organization Management Chain of the Large and Medium-Sized Project in the Construction Period

Abstract Full-Text HTML Download Download as PDF (Size:94KB) PP. 131-139
DOI: 10.4236/jwarp.2011.32016    4,817 Downloads   8,609 Views   Citations

ABSTRACT

On the basis of analyzing the reliability of the organization’ management chain of the large and medium- sized project in the construction period, the paper studies the factors influencing the reliability of the organi-zation management chain, which, corresponding to four elements of management chain – “Management Loop”, “Management Link”, “Management Chain”, and “Management Network”, can be summarized as project main body, interface management, connection sequence and management model. The paper then re-searches on the specific influencing factors from the above-mentioned four aspects.

Conflicts of Interest

The authors declare no conflicts of interest.

Cite this paper

J. Feng, Y. Qian, Z. Liu and H. Li, "Study on Factors Influencing the Reliability of the Organization Management Chain of the Large and Medium-Sized Project in the Construction Period," Journal of Water Resource and Protection, Vol. 3 No. 2, 2011, pp. 131-139. doi: 10.4236/jwarp.2011.32016.

References

[1] J. C. Feng, et al., “Reliability Model of Organization Management Chain of South-to-North Water Diversion Project during Construction Period,” Water Science and Engineering, Vol. 1, No. 4, June 2008, pp. 107-113.
[2] W. U. Limin, “The Discussion on Theory of Management Chain,” Journal of Wuhan Polytechnic University, Vol. 22, No. 4, 2003, pp. 83-85.
[3] B. Guo, et al., “System Reliability Analysis,” Defence Science University Press, Changsha, 2002.
[4] C. H. Chen, et al., “Construction of the Supply Chain Based on the Reliability,” Industrial Engineering and Management, Vol. 9, No. 1, 2004, pp. 72-74.
[5] B. Z. Du, “The Understanding of the Project Delegating Construction Management Model in South-to-North Water Diversion Project,” Hebei Water Resources and the South-to-North Water Diversion, No. 4, 2008, pp. 1-2.
[6] Mid-South Design & Research Institute, Hohai University, “Contract Project Management Theory and Practice,” China WaterPower Press, Beijing, 2009.
[7] Z. F. Yu, et al., “Project Organization,” Tsinghua University Press, Beijing, 2000.
[8] W. Z. Gao, “The Research on Characteristics of Organizational Culture Systems,” Market Modernization, No. 5, 2006, pp. 86-87.
[9] E. Schein, “Organization Culture,” American Psychologist, Vol. 9, No. 2, 1990, pp. 45-53.
[10] T. Jing, “Potential Risks and Countermeasures of Subway Project Interface Management,” Sichuan Building, No. 5, 2006, pp. 181-184.
[11] M. Li, “Interface Management in Construction Project,” Optimization of Capital Construction, Vol. 27, No. 5, 2006, pp. 32-34.
[12] Y. Qi, “The Research on Key-Indexes-Oriented Interface Management System of Nuclear Power Plant Project,” Harbin Engineering University, Harbin, 2008.
[13] Q. H. Zhao, “The Administrative Supervision of Construction Works Contract,” Construction Management Modernization, No. 3, 2001, pp. 32-34.
[14] S. X. Luo, et al., “The Research on Project Coordination Management,” Value Engineering, No. 7, 2008, pp. 131- 134.
[15] H. Yu, “On the Government Regulation in Administrative Reform,” Jianghai Academic Journal, No. 1, 2004, pp. 76-79.
[16] B. Sun, “The Research on Supervision Mode of Major National Projects,” Hohai University, Nanjing, 2003.

  
comments powered by Disqus

Copyright © 2019 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.