Benefits of DfX in Requirements Engineering
Jari Lehto, Janne Harkonen, Harri Haapasalo, Pekka Belt, Matti Mottonen, Pasi Kuvaja
.
DOI: 10.4236/ti.2011.21004   PDF    HTML     18,720 Downloads   38,988 Views   Citations

Abstract

Information and communications technology (ICT) companies have realised how acknowledging the needs of both internal and external customers is a necessity for successful requirements engineering. Design for X (DfX) is a potential management approach for coordinating & communicating requirements emerging from both internal functions and external supply chain partners. This article studies the potential of DfX for improved requirements engineering. Qualitative interviews are utilised to analyse how different organisations implement the concept, including designers’ actual work, methods & tools, and organisational aspects. The results include viewing DfX as means to achieve relevant competitive goals, and describing how different companies organise these activities, together with their benefits for modern ICT companies. This study highlights how the DfX concept can be used to manage, prioritise and to better communicate

Share and Cite:

J. Lehto, J. Harkonen, H. Haapasalo, P. Belt, M. Mottonen and P. Kuvaja, "Benefits of DfX in Requirements Engineering," Technology and Investment, Vol. 2 No. 1, 2011, pp. 27-37. doi: 10.4236/ti.2011.21004.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] C. Zeidler, C. Kittl and O. Petrovic, “An Integrated Product Development Process for Mobile Software,” International Journal of Mobile Communications, Vol. 6, No. 3, 2007, pp. 345-356.
[2] G. Pahl, W. Beitz, J. Feldhusen, K. H. Grote, K. Wallace and L. Blessing, “Engineering Design - a Systematic Approach,” 3rd Ed., Springer-Verlag, London, 2007.
[3] P. Belt, J. Harkonen, M. Mottonen, P. Kess and H. Haapasalo, “Improving the Efficiency of Verification and Validation,” International Journal of Services and Standards, Vol. 4, No. 2, 2008, pp. 150-166. doi:10.1504/IJSS.2008.016630
[4] P. Helo, “Managing Agility and Productivity in the Electronics Industry,” Industrial Management & Data Systems, Vol. 104, No. 7, 2004. pp. 567-577. doi:10.1108/02635570410550232
[5] L. Bengtsson and C. Berggren, “The Integrator’s New Advantage - the Reassessment of Outsourcing and Production Competence in a Global Telecom Firm,” European Management Journal, Vol. 26, No. 5, 2008, pp. 314-324.
[6] J. G. Bralla, “Design for Excellence,” 1st Ed., McGraw- Hill, New York, 1996.
[7] K. W. Lau, R. C. M. Yam and E. P. Y. Tang, “Supply Chain Product Co-Development, Product Modularity and Product Performance: Empirical Evidence from Hong Kong Manufacturers,” Industrial Management & Data Systems, Vol. 107, No. 7, 2007, pp. 1036-1065. doi:10.1108/02635570710816739
[8] J. Harkonen, P. Belt, M. Mottonen, P. Kess and H. Haapasalo, “Maturity of Verification and Validation in ICT Companies,” International Journal of Innovation and Learning, Vol. 6, No. 1, 2009, pp. 33-50. doi:10.1504/IJIL.2009.021681
[9] C. C. Yang, S. H. Chen and J. Y. Shiau, “A DfX and Concurrent Engineering Model for the Establishment of a New Department in a University,” International Journal of Production Economics, Vol. 107, No. 1, 2007, pp. 179- 189. doi:10.1016/j.ijpe.2006.08.009
[10] B. Verworn, C. Herstatt and A. Nagahira, “The Fuzzy Front End of Japanese New Product Development Projects: Impact on Success and Differences between Incremental and Radical Projects,” R&D Management, Vol. 38, No. 1, 2008, pp. 1-19. doi:10.1111/j.1467-9310.2007.00492.x
[11] D. A Gatenby and G. Foo, “Design for X (DfX): Key to Competitive, Profitable Products,” AT&T Technical Journal, Vol. 69, No. 3, 1990, pp. 2-13.
[12] J. Jiang, M. Shiu and M. Tu, “DfX and DfSS: How QfD Integrates Them,” Quality Progress, Vol. 40, No. 10, 2007, pp. 45-52.
[13] E. Gubi and J. Heikkila, “Concurrent Product and Demand Chain Creation - in Search of Contingencies and Strategic Choices,” EurOMA/POMS Conference, Como, Italy, 2003.
[14] R. Maltzman, K. M. Rembis, M. Donisi, M. Farley, R. C. Sanchez and A. Y. Ho, “Design for Networks - the Ultimate Design for X,” Bell Labs Technical Journal, Vol. 9, No. 4, 2005, pp. 5-23. doi:10.1002/bltj.20057
[15] R. G. Cooper, S. J. Edgett and E. J. Kleinschmidt, “Benchmarking Best NPD Practices - III,” Research Technology Management, Vol. 47, No. 6, 2004, pp. 43-55.
[16] Gupta, K. S. Pawara and P. Smart, “New Product Development in the Pharmaceutical and Telecommunication Industries: A Comparative Study,” International Journal of Production Economics, Vol. 106, No. 1, 2007, pp. 41-60. doi:10.1016/j.ijpe.2006.04.008
[17] T. C. Kuo, S. H. Huang and H. C. Zhang, “Design for Manufacture and Design for ‘X’: Concepts, Applications, and Perspectives,” Computers & Industrial Engineering, Vol. 41, No. 3, 2001, pp. 241-260. doi:10.1016/S0360-8352(01)00045-6
[18] M. Bruce, R. Cooper, B. Morris and A. Wootten, “Managing Requirements Capture within a Global Telecommunications Company,” R&D Management, Vol. 29, No. 2, 1999, pp. 107-120. doi:10.1111/1467-9310.00122
[19] K. W. Jablokow and D. E. Booth, “The Impact and Management of Cognitive Gap in High Performance Product Development Organizations,” Journal of Engineering and Technology Management, Vol. 23, No. 4, 2006, pp. 313-336. doi:10.1016/j.jengtecman.2006.08.003
[20] M. Mottonen, J. Harkonen, P. Belt, H. Haapasalo and J. Simila, “Managerial View on Design for Manufacturing,” Industrial Management & Data Systems, Vol. 109, No. 6, 2009, pp. 859-872. doi:10.1108/02635570910968081
[21] S. Spahi and Y. Hosni, “Optimising the Degree of Customisation for Products in Mass Customisation Systems,” International Journal of Mass Customisation, Vol. 3, No. 1, 2009, pp. 82-114. doi:10.1504/IJMASSC.2009.021662
[22] G. Boothroyd, W. Knight and P. Dewhurst, “Product Design for Manufacture and Assembly,” 2nd Ed., Marcel Dekker, New York, 2001.
[23] G. Boothroyd, P. Dewhurst and W. Knight, “Product Design for Manufacture and Assembly,” Illustration Edition, Marcel Dekker, New York, 1994.
[24] G. Q. Huang, “Implementing Design for X Tools, In: G. Q. Huang, Ed. Design for X: Concurrent Engineering Imperatives,” 1st Ed., Chapman & Hall, London, 1996.
[25] S. H. Huang, T. C. Kuo and H. C. Zhang, “Design for Manufacture and Design for ‘X’: Concepts, Applications, and Perspectives,” Computers & Industrial Engineering, Vol. 41, No. 3, 2001, pp. 241-260. doi:10.1016/S0360-8352(01)00045-6
[26] C. H. Fine, “Clockspeed: Winning Industry Control in the Age of Temporary Advantage,” Perseus Books, New York, 1998.
[27] R. K. Srivastava, T. A. Shervani and L. Fahey, “Marketing, Business Processes, and Shareholder Value: An Organizationally Embedded View of Marketing Activities and the Discipline of Marketing,” The Journal of Marketing, Vol. 63, 1999, pp. 168-179. doi:10.2307/1252110
[28] Griffin, “Modeling and Measuring Product Development Cycle Time Across Industries,” Journal of Engineering and Technology Management, Vol. 14, No. 1, 1997, pp. 1-24. doi:10.1016/S0923-4748(97)00004-0
[29] L. M. Birou and S. E. Fawcett, “Supplier Involvement in Integrated Product Development,” International Journal of Physical Distribution & Logistics Management, Vol. 24, No. 5, 1994, pp. 4-14. doi:10.1108/09600039410063982
[30] R. Van Dierdonck, “The Manufacturing/Design Interface,” R&D Management, Vol. 20, No. 3, 1990, pp. 203-209. doi:10.1111/j.1467-9310.1990.tb00710.x
[31] J. M. Morgan and J. K. Liker, “The Toyota Product Development System: Integrating People, Process, and Technology,” Productivity Press, New York, 2006.
[32] P. Hines, M. Francis and P. Found, “Towards Lean Product Lifecycle Management: A Framework for New Product Development,” Journal of Manufacturing Technology Management, Vol. 17, No. 7, 2006, pp. 866-887. doi:10.1108/17410380610688214
[33] D. N. Ford and D. K. Sobek II, “Adapting Real Options to New Product Development by Modeling the Second Toyota Paradox,” IEEE Transactions on Engineering Management, Vol. 52, No. 2, 2005, pp. 175-185. doi:10.1109/TEM.2005.844466
[34] H. S. Abdalla, “Concurrent Engineering for Global Manufacturing,” International Journal of Production Economics, Vol. 60-61, 1999, pp. 251-260. doi:10.1016/S0925-5273(98)00152-2
[35] N. King and A. Majchrzak, “Concurrent Engineering Tools: Are the Human Issues Being Ignored?,” IEEE Transactions on Engineering Management, Vol. 43, No. 2, 1996, pp. 189-201. doi:10.1109/17.509984
[36] S. K. Fixson, “Product Architecture Assessment: A Tool to Link Product, Process, and Supply Chain Design Decisions,” Journal of Operations Management, Vol. 23, No. 3-4, 2005, pp. 345-369. doi:10.1016/j.jom.2004.08.006
[37] Grossler and A. Grubner, “An Empirical Model of the Relationships between Manufacturing Capabilities,” International Journal of Operations & Production Management, Vol. 26, No. 5, 2006, pp. 458-485.
[38] X. Koufteros, M. Vonderembse and W. Doll, “Concurrent Engineering and Its Consequences,” Journal of Operations Management, Vol. 19, No. 1, 2001, pp. 97-115. doi:10.1016/S0272-6963(00)00048-6
[39] Y. Asiedu, “Product Life Cycle Cost Analysis: State of the Art Review,” International Journal of Production Research, Vol. 36, No. 4, 1998, pp. 883-908. doi:10.1080/002075498193444
[40] D. M. Anderson, “Design for Manufacturability & Concurrent Engineering,” CIM Press, California, Cambria, 2006.
[41] S. Rabino and A. Wright, “Accelerated Product Introductions and Emerging Managerial Accounting Perspectives: Implications for Marketing Managers in the Technology Sector,” Journal of Product Innovation Management, Vol. 10, No. 2, 2003, pp. 126-135. doi:10.1016/0737-6782(93)90004-A
[42] M. L. Li, “Product Structure Management (PSM) & Profitability,” PSM & Profitability, 2008, pp. 1-7.
[43] L. M. Birou, S. E. Fawcett and G. M. Magnan, “The Product Life Cycle: A Tool for Functional Strategic Alignment,” International Journal of Purchasing and Materials Management, Vol. 34, No. 2, 2006, pp. 37-52.
[44] M. Swink and M. H. Way, “Manufacturing Strategy: Propositions, Current Research, Renewed Directions,” International Journal of Operations & Production Management, Vol. 15, No. 7, 1995, pp. 4-26. doi:10.1108/01443579510090381
[45] G. M. Magnan, S. E. Fawcett and L. M. Birou, “Benchmarking Manufacturing Practice Using the Product Life Cycle,” Benchmarking: An International Journal, Vol. 6, No. 3, 1999, pp. 239-253.
[46] J. S. Kim and P. Arnold, “Manufacturing Competence and Business Performance: A Framework and Empirical Analysis,” International Journal of Operations & Production Management, Vol. 13, No. 10, 1993, pp. 4-25. doi:10.1108/01443579310045518
[47] G. Pahl, W. Beitz, K. Wallace, L. Blessing and F. Bauert, “Engineering Design: A Systematic Approach,” 2nd Ed., Springer, England, 1996.
[48] Gunasekaran, “Agile Manufacturing: Enablers and an Implementation Framework,” International Journal of Production Research, Vol. 36, No. 5, 1998, pp. 1223- 1247. doi:10.1080/002075498193291
[49] Y. M. Chen and J. J. Liu “Cost-Effective Design for Injection Molding,” Robotics and Computer-Integrated Manufacturing, Vol. 15, No. 1, 1999, pp. 1-21. doi:10.1016/S0736-5845(99)00005-8
[50] E. M. Shehab and H. S. Abdalla, “Manufacturing Cost Modelling for Concurrent Product Development,” Robotics and Computer-Integrated Manufacturing, Vol. 17, No. 4, 2001, pp. 341-353. doi:10.1016/S0736-5845(01)00009-6
[51] C. Ou-Yang and T. S. Lin, “Developing an Integrated Framework for Feature-Based Early Manufacturing Cost Estimation,” The International Journal of Advanced Manufacturing Technology, Vol. 13, No. 9, 2005, pp. 618-629. doi:10.1007/BF01350820
[52] J. D. Booker, “Industrial Practice in Designing for Quality,” International Journal of Quality & Reliability Management, Vol. 20, No. 3, 2003, pp. 288-303. doi:10.1108/02656710310461305
[53] B. J. C. Babu, R. T. D. Prabhakaran and V. P. Agrawal, “DfX Analysis Applied to Composite Products,” Journal of Reinforced Plastics and Composites, Vol. 27, No. 3, 2008, pp. 287-312. doi:10.1177/0731684407083010
[54] Subramani and P. Dewhurst, “Efficient Design for Service Considerations,” Manufacturing Review, Vol. 6, No. 1, 1993, pp. 40-47.
[55] J. Gershenson and K. Ishii, “Life-Cycle Serviceability Design,” In A. Kusiak, Ed. Concurrent Engineering: Automation, tools and techniques, Wiley-Interscience, New York, 1993, pp. 363-384.
[56] J. K. Gershenson and G. J. Prasad, “Product Modularity and Its Effect on Service and Maintenance,” Proceedings of the Maintenance and Reliability Conference, Knoxville, Tennessee, May 1997.
[57] K. Goffin and C. New, “Customer Support and New Product Development - an Exploratory Study,” International Journal of Operations & Production Management, Vol. 21, No. 3, 2001, pp. 275-301. doi:10.1108/01443570110364605
[58] S. Cavalieri, P. Gaiardelli and S. Ierace, “Aligning Strategic Profiles with Operational Metrics in After-Sales Service,” International Journal of Productivity and Performance Management, Vol. 56, No. 5/6, 2007, pp. 436- 455. doi:10.1108/17410400710757132
[59] M. Antioco, R. K. Moenaert, R. A. Feinberg and M. G. M. Wetzels, “Integrating Service and Design: The Influences of Organizational and Communication Factors on Relative Product and Service Characteristics,” Journal of the Academy of Marketing Science, Vol. 36, No. 4, 2008, pp. 501-521. doi:10.1007/s11747-008-0097-x
[60] Gupta, W. A. Wallace and N. K. Sondheimer, “Functional Guarantees: A New Service Paradigm,” International Journal of Product Development, Vol. 5, No. 1-2, 2008, pp. 153-175. doi:10.1504/IJPD.2008.016375
[61] T. Naslund and J. Lowgren, “Usability Inspection in Contract-Based Systems Development - a Contextual Assessment,” Journal of Systems and Software, Vol. 45, No. 3, 1999, pp. 233-240. doi:10.1016/S0164-1212(98)10082-1
[62] T. Kaski and J. Heikkila, “Measuring Product Structures to Improve Demand-Supply Chain Efficiency,” International Journal of Technology Management, Vol. 23, No. 6, 2002, pp. 578-598. doi:10.1504/IJTM.2002.003027
[63] K. W. Lau, R. C. M. Yam and E. Tang, “The Impacts of Product Modularity on Competitive Capabilities and Performance: An Empirical Study,” International Journal of Production Economics, Vol. 105, No. 1, 2007, pp. 1-20. doi:10.1016/j.ijpe.2006.02.002
[64] M. L. Swink and R. Calantone, “Design-Manufacturing Integration as a Mediator of Antecedents to New Product Design Quality,” IEEE Transactions on Engineering Management, Vol. 51, No. 4, 2004, pp.472-482. doi:10.1109/TEM.2004.835088
[65] R. W. Schmenner and M. V. Tatikonda, “Manufacturing Process Flexibility Revisited,” International Journal of Operations & Production Management, Vol. 25, No. 12, 2005, pp. 1183-1189. doi:10.1108/01443570510633585
[66] S. Vehtari, “The Dynamics Involved with Manufacturing Capabilities towards a Competitive Advantage,” series 2006/1, Helsinki University of Technology, Helsinki, 2006.
[67] Y. Liu, Y. Li and Z. Wei, “How Organizational Flexibility Affects New Product Development in an Uncertain Environment: Evidence from China,” International Journal of Production Economics, Vol. 120, No. 1, 2009, pp. 18-29. doi:10.1016/j.ijpe.2008.07.026
[68] J. Bralla, “Design for Manufacturability Handbook,” 2nd Ed., McGraw-Hill Professional, New York, 1998.
[69] S. H. Huang, G. Wang and J. P. Dismukes, “A Manufacturing Engineering Perspective on Supply Chain Integration,” Proceedings of the 10th International Conference on Flexible Automation and Intelligent Manufacturing, Maryland, USA, 2000, pp. 204-214.
[70] N. R. Joglekar and S. R. Rosenthal, “Coordination of Design Supply Chains for Bundling Physical and Software Products,” Journal of Product Innovation Management, Vol. 20, No. 5, 2003, pp. 374-390. doi:10.1111/1540-5885.00035
[71] J. Lamothe, K. Hadj-Hamou and M. Aldanondo, “An Optimization Model for Selecting a Product Family and Designing Its Supply Chain,” European Journal of Operational Research, Vol. 169, No. 3, 2006, pp. 1030- 1047. doi:10.1016/j.ejor.2005.02.007
[72] T. W. Williams and K. P. Parker, “Design for Testability: a Survey,” Proceedings of the IEEE, Vol. 71, No. 1, 1983, pp. 98-112. doi:10.1109/PROC.1983.12531
[73] J. P. Teixeira, I. C. Teixeira, C. F. B. Almeida, F. M. Gon?alves and J. Gon?alves, “A Methodology for Testability Enhancement at Layout Level,” Journal of Electronic Testing, Vol. 1, No. 4, 1990, pp. 287-299. doi:10.1007/BF00136317
[74] R. V. Binder, “Design for Testability in Object-Oriented Systems,” Communications of the ACM, Vol. 37, No. 9, 1994, pp. 87-101. doi:10.1145/182987.184077
[75] P. S. Parikh and M. Abramovici, “Testability-Based Partial Scan Analysis,” Journal of Electronic Testing, Vol. 7, No. 1-2, 1995, pp. 61-70. doi:10.1007/BF00993314
[76] D. Wang, Y. Hu, H. W. Li and X. W. Li, “Design-For- Testability Features and Test Implementation of a Giga Hertz General Purpose Microprocessor,” Journal of Computer Science and Technology, Vol. 23, No. 6, 2008, pp. 1037-1046. doi:10.1007/s11390-008-9193-0
[77] J. M. Solana, “Reducing Test Application Time, Test Data Volume and Test Power through Virtual Chain Partition,” Integration the VLSI Journal, Vol. 42, No. 3, 2009, pp. 385-399. doi:10.1016/j.vlsi.2008.12.001
[78] T. Dowie, “Green Design,” World Class Design to Manufacture, Vol. 1, No. 4, 1994, pp. 32-38. doi:10.1108/09642369210063045
[79] J. R. Fiksel, “Design for Environment: Creating Eco- Efficient Products and Processes,” McGraw-Hill, New York, 1996.
[80] Gungor and S. M. Gupta, “Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey,” Computers & Industrial Engineering, Vol. 36, No. 4, 1999, pp. 811-853. doi:10.1016/S0360-8352(99)00167-9
[81] F. Kurk and P. Eagan, “The Value of Sdding Design-For-The-Environment to Pollution Prevention Assistance Options,” Journal of Cleaner Production, Vol. 16, No. 6, 2008, pp. 722-726. doi:10.1016/j.jclepro.2007.02.022
[82] W. Eversheim and M. Baumann, “Assembly-Oriented Design Process,” Computers in Industry, Vol. 17, No. 2-3, 1991, pp. 287-300. doi:10.1016/0166-3615(91)90041-7
[83] C. Poli and W. A. Knight, “Design for Forging HandBook,” Technical Report, Mechanical Engineering Department, University of Massachusetts, Dartmouth, MA, 1984.
[84] G. Q. Huang and K. L. Mak, “Internet Applications in Product Design and Manufacturing,” 1st Ed., Springer, Berlin, 2003.
[85] H. Meerhamm, “Design for X - a Core Area of Design Methodology,” Journal of Engineering Design, Vol. 5, No. 2, 1994, pp. 145-163.
[86] S. Y. T. Lang, J. Dickinson and R. O. Buchal, “Cognitive Factors in Distributed Design,” Computers in Industry, Vol. 48, No. 1, 2002, pp. 89-98. doi:10.1016/S0166-3615(02)00012-X
[87] J. W. Herrmann, J. Cooper, S. K. Gupta, C. C. Hayes, K. Ishii, D. Kazmer, P. A. Sandborn and W. H. Wood, “New Directions in Design for Manufacturing,” Proceedings of the ASME Design Engineering Technical Conferences and Computers and Information in Engineering Conference, Salt Lake City, Utah, 28 September - 2 October, 2004.
[88] R. Merton, M. Fiske and P. Kendall, “The Focused Interview: A Manual of Problems and Procedures,” 2nd Ed., the Free Press, New York, 1990.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.