TITLE:
Fore Sighting and Estimating the Risk of Investing in the Construction of Power Plants Using AHP
AUTHORS:
Shayan Hosseini, Gevork Gharehpetian, Fereshteh Farzianpour
KEYWORDS:
Fore Sighting, Risk Estimation, Construction of Power Plants, AHP
JOURNAL NAME:
Journal of Service Science and Management,
Vol.8 No.4,
August
10,
2015
ABSTRACT: Today, with advances that have occurred in electricity industry and technology of manufacturing all kinds of power plants whether renewable or perishable, making decision to choose the type and kind of an ideal plant is very important and strategic. For any weakness in determining short, medium and long term parameters affecting deciding whether technical, economical, environmental, social, political , and so on may cause irreparable damage. Also timing and fore sighting factors should be taken into account in decision-making equations. Selecting the type suitable for use in power plants connected to the network or independent sector is the main part of task. Therefore, because there are many variables and factors in the text and the margin of such a task, bed and plant kind selection is very difficult and time consuming. This choice is ultimately influenced by many technical and non-technical measures that are each divided into further subcategories. Due to repetition of this operation in the discussion of issues, finding an efficient way in this area would be very useful. In this paper, a hierarchical decision-making procedure for the selection of the ideal power for productivity and satisfaction in the operation of taking is introduced. That can be generalized to other types of construction and operation concepts in technologies of power plants.