Abstract: |
By combining with the implementation in expressway of traffic branch’s test point of design construction pattern of contract, the paper illustrates the risks from the bidding, the design of the construction graphic, the process dynamic design and construction process, the recognition of the unpredictable risks, the risk recognition, the evaluation, the prevention and the control of the risk management, so as to seek for the method which can be favorable for improving the design construction contract.
|