Journal of Building Construction and Planning Research

Volume 3, Issue 4 (December 2015)

ISSN Print: 2328-4889   ISSN Online: 2328-4897

Google-based Impact Factor: 0.5  Citations  

Representing the Knowledge of Public Construction Project Cost Estimator by Using Rule-Based Method

HTML  XML Download Download as PDF (Size: 302KB)  PP. 189-195  
DOI: 10.4236/jbcpr.2015.34019    5,202 Downloads   7,161 Views  Citations

ABSTRACT

Despite the presence of various construction project cost estimate softwares, human experience and knowledge cannot be disregarded. This fact has been proven in practice, where the success of construction cost estimate process is mainly based on knowledge of human estimator. The main question concerns what human knowledge determines the success of the construction cost estimation process. To address this question we have applied Delphi technique and the output is eleven factors that are enough to precisely represent construction cost estimator knowledge. Then we have used First Order Logic (FOL) to represent these factors in terms of predicates and rules. These FOL rules could be used for evaluating construction cost estimator knowledge in five classes: fail, pass, acceptable, good, and very good. As a validation process we have done experiments using history data and the results have proved the accuracy of our proposed method.

Share and Cite:

Elfaki, A.O. and Alatawi, S. (2015) Representing the Knowledge of Public Construction Project Cost Estimator by Using Rule-Based Method. Journal of Building Construction and Planning Research, 3, 189-195. doi: 10.4236/jbcpr.2015.34019.

Cited by

[1] Critical Risks to Construction Cost Estimation
2021
[2] Critical Risks to Construction Cost Estimation.
2021
[3] SYSTEM PATHOGENS INHIBITING CONSTRUCTION PROJECT RISK MANAGEMENT PERFORMANCE: DELIBERATE IGNORANCE PERSPECTIVE
2020
[4] Relevance of student productive skills competencies based on construction services needs
2020
[5] Regression Model of Shop-house Construction Costs and Percentage of Building Component Costs
2019
[6] Domanant factors of the knowledge competency of vocational highschool students according to the need of construction services
2019
[7] Fuzzy Forecasting of Workload for Aircraft Design Projects
2019
[8] ANALISIS PENGARUH KUALIFIKASI ESTIMATOR TERHADAP TERJADINYA OPTIMISTIC BIAS DAN PESSIMISTIC BIAS DALAM ESTIMASI PROYEK
2019
[9] Oxidative stability of crude extract of red variety rice bran from Minahasa, North Sulawesi on lipid-based food products
2019
[10] Dominant Factors of the Knowledge Competency of Vocational High School Students According to the Need of Construction Services
The 4th International Conference of Vocational …, 2019
[11] PROGRAM PRAKTIS PENYUSUN BILL OF QUANTITY PEMBANGUNAN RUKO DENGAN ANALISIS REGRESI
2019
[12] Flexible Management of Essential Construction Tasks Using Fuzzy OLAP Cubes'
2018
[13] Flexible Management of Essential Construction Tasks Using Fuzzy OLAP Cubes
FUZZY HYBRID COMPUTING IN CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018
[14] Limitations of Risk Identification Tools Applied in Project Management in the Nigerian Construction Industry
2018
[15] Conceptual Estimation of Cost Significant Model on Shop-Houses Construction
2018
[16] Estimated budget construction housing using linear regression model easy and fast solutions accurate
2017
[17] What are the Dominant Factors of Students' Productive Skills in Construction Services?
2017
[18] Analysis of ionospheric precursor of earthquake using GIM-TEC, kriging and neural network
2015

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.