[1]
|
Validation of the UNICEF fiscal diagnostic tool for SDGs 6.1 and 6.2 in East and Southern Africa using the analytical hierarchy process (AHP)
|
|
Journal of Water …,
2022 |
|
|
[2]
|
Weighting of Firefighting Turnout Gear Risk Factors According to Expert Opinion
|
|
Sustainability,
2022 |
|
|
[3]
|
Parameters of effects in decision making of automotive assembly line using the Analytical Hierarchy Process method
|
|
CIRP Journal of Manufacturing …,
2022 |
|
|
[4]
|
Assessment of Construction Project Contractor Selection Success Factors considering Their Interconnections
|
|
KSCE Journal of Civil Engineering,
2022 |
|
|
[5]
|
Integration of GIS and multi-criteria analysis for the assessment of the sensitivity to urbanization in Biskra and its neighboring oases, Algeria
|
|
GeoJournal,
2022 |
|
|
[6]
|
Prioritizing and overcoming biomass energy barriers: Application of AHP and G-TOPSIS approaches
|
|
… Forecasting and Social …,
2022 |
|
|
[7]
|
A multicriteria model to select candidates for public contracting using the OPTIONCARDS method
|
|
Automation in Construction,
2022 |
|
|
[8]
|
AHP-GeoTOPSIS method to analyze priority areas for sugarcane plantation development in Lamongan Regency
|
|
IOP Conference Series: Earth and …,
2022 |
|
|
[9]
|
MCDM for Selection of Cybersecurity Technologies Used in Cybersecurity Education
|
|
2022 |
|
|
[10]
|
Evaluasi Kinerja Penyedia Jasa pada Pekerjaan Preservasi Jalan Nasional dengan Metode Ahp: Ruas Jalan Simpang Kawat–Aek Kanopan-Rantau Prapat-BTS …
|
|
Syntax Idea,
2022 |
|
|
[11]
|
СППР для оцінювання проєктів електростанцій на основі методу Fuzzy Best-Worst
|
|
2022 |
|
|
[12]
|
แบบ จำลอง การ คัดเลือก ขึ้น บัญชี เป็น ผู้ มี คุณสมบัติ เบื้องต้น ใน การ จ้าง ก่อสร้าง งาน ชลประทาน (Contractor's Pre-Registration Model for Irrigation Construction)
|
|
Sripatum Review of Science and …,
2022 |
|
|
[13]
|
Penerapan Metode Simple Additive Weighting (SAW) Penentuan Lokasi Tower Operator Selular
|
|
2021 |
|
|
[14]
|
Evaluation of Indonesia Sustainable Palm Oil Certification Using Green SCOR (Hasil Check Similarity)
|
|
2021 |
|
|
[15]
|
Credit Evaluation of the Highway Construction Enterprises Based on the Combination Weighting-Grey Correlation TOPSIS Model
|
|
2021 9th International Conference on Traffic …,
2021 |
|
|
[16]
|
Criteria for Subcontractor Selection on Building Construction Project in Cambodia: Prequalification and Bid Evaluation
|
|
2021 The 7th International Conference …,
2021 |
|
|
[17]
|
Application of Multi-Criteria Decision-Making Model and Expert Choice Software for Coastal City Vulnerability Evaluation
|
|
Urban Science,
2021 |
|
|
[18]
|
Multi-criteria decision-making model for supplierevaluation and selection in oil and gas companies
|
|
Algerian Rev. Econ …,
2021 |
|
|
[19]
|
Proposal to use the Analytic Hierarchy Process Method Evaluate Bank Credit Submissions
|
|
2021 |
|
|
[20]
|
Project Resources Management: Selecting Contractor for Public Construction Projects in Malaysia
|
|
2021 |
|
|
[21]
|
Proposing predictive maintenance strategy to increase OEE through system upgrade scenarios and AHP
|
|
2021 |
|
|
[22]
|
Multi-criteria decision-making model for supplier evaluation and selection in oil and gas companies
|
|
2021 |
|
|
[23]
|
An Empirical Analysis of Project Performance Outcomes for Best-Value Procurement in Design–Bid–Build Projects
|
|
2021 |
|
|
[24]
|
Using a GIS-based Multi-Criteria Evaluation Model to Identify Suitable Spawning Habitat and Priority Restoration Sites for Lake Sturgeon (Acipenser fulvescens) …
|
|
2021 |
|
|
[25]
|
A Process-Based Approach for Integrating the Last Planner System In 4D Modeling for Equipment Workspace Planning in Elevated Urban Highway
|
|
2021 |
|
|
[26]
|
Multidimensional Outlook on Environment
|
|
2021 |
|
|
[27]
|
Implementasi Metode AHP-TOPSIS dalam Sistem Pendukung Rekomendasi Mahasiswa Berprestasi
|
|
2021 |
|
|
[28]
|
Selection of Contractor by Using Analytical Hierarchy Process (AHP)
|
|
2020 |
|
|
[29]
|
Contractor prequalification for green buildings—evidence from Turkey
|
|
2020 |
|
|
[30]
|
Leadership Selection at Vocational Education Based on Digital Leadership Model Using AHP Method
|
|
2020 |
|
|
[31]
|
Pengukuran Kinerja Organisasi pada Kantor Pelayanan Perbendaharaan Negara Surabaya (KPPN) II Menggunakan Metode Analytycal Hierarchy Process
|
|
ALGEBRA,
2020 |
|
|
[32]
|
Penentuan Bobot Kriteria Pemilihan Alternatif Online-Shop dalam Memasarkan Produk Kosmetik dengan Menggunakan Analytical Hierarchy Process (AHP)
|
|
2020 |
|
|
[33]
|
Implementasi Metode Analytical Hierarchy Process (AHP) pada Sistem Pendukung Keputusan Pembelian Mobil di Bandar Lampung
|
|
2020 |
|
|
[34]
|
PEMILIHAN SEKALA PRIORITAS PEMBANGUNAN SARANA DAN PRASARANA DESA DENGAN METODE ANALYTICAL HIERARCHY PROCESS
|
|
2020 |
|
|
[35]
|
A support system for accepting student assistance using analytical hierarchy process and simple additive weighting
|
|
2020 |
|
|
[36]
|
The Decision of Selecting Online-Store Alternative in Marketing Cosmetic Products Using Analytical Hierarchy Process (AHP)
|
|
2020 |
|
|
[37]
|
A risk-oriented tender evaluation system for construction projects in Malaysia
|
|
2020 |
|
|
[38]
|
Analysis on barriers to biogas dissemination in Rwanda: AHP approach
|
|
2020 |
|
|
[39]
|
Optimation economic order quantity method for a support system reorder point stock
|
|
2020 |
|
|
[40]
|
Selection of Contractor Using Analytical Hierarchy Process-A Review
|
|
2020 |
|
|
[41]
|
Investigating the design workflow for designing a component for Additive Manufacturing: A case study of designing a Jet engine combustion chamber component for …
|
|
2020 |
|
|
[42]
|
Penerapan Algoritma Analytic Hierarchy Process untuk Penentuan Lokasi Prioritas Penyuluhan Program Keluarga Berencana
|
|
2020 |
|
|
[43]
|
Supplier Structure and Performance Evaluation of Supplier Network Phase Rice Supply Chain Management in South Sumatra: Similarity
|
|
THESIS,
2020 |
|
|
[44]
|
MULTICRITERIAL ANALYSIS OF THE CHOICE OF WASTE UTILIZATION TECHNOLOGY USING PAIR COMPARISONS
|
|
2020 |
|
|
[45]
|
A Case Study on Selection of Contractor using Analytical Hierarchy Process
|
|
2020 |
|
|
[46]
|
Optimation economic order quantity method for a support system reorder point stock.
|
|
2020 |
|
|
[47]
|
DESIGNING A FUZZY INFERENCE SYSTEM FOR CONTRACTOR SELECTION UNDER UNCERTAINTY
|
|
2020 |
|
|
[48]
|
An Integrated Organizational System for Project Source Selection in the Major Iranian Construction Companies
|
|
2020 |
|
|
[49]
|
Application of Multi-Criteria Decision Making in Tender Evaluation: A Study Using ANP Model
|
|
2020 |
|
|
[50]
|
PENERAPAN SISTEM PENDUKUNG KEPUTUSAN DENGAN METODE AHP UNTUK PENILAIAN KARYAWAN TERBAIK
|
|
… : Jurnal Teknik dan Inovasi Mesin Otomotif …,
2020 |
|
|
[51]
|
SEARCHING FOR A SUITABLE LANDFILL SITE
|
|
Ilaro Journal of Environmental Research & Development,
2019 |
|
|
[52]
|
An Experimental Comparison of Multi-Criteria Decision AID (Mcda) For Contractors' Evaluation
|
|
2019 |
|
|
[53]
|
Analytical Hierarchy Process (AHP) Model for Prioritizing Alternative Strategies for Malaria Control
|
|
2019 |
|
|
[54]
|
Metode Analitical Hierarchy Process (AHP) Dalam Pemilihan Umum Presiden Indonesia 2019
|
|
2019 |
|
|
[55]
|
Selection of enterprise resource planning software using analytic hierarchy process
|
|
2019 |
|
|
[56]
|
Supplier Structure and Performance Evaluation of Supplier Network Phase Rice Supply Chain Management in South Sumatra
|
|
2019 |
|
|
[57]
|
Linking Best-Value Procurement with Project Performance Outcomes in Design-Bid-Build Vertical Construction Projects
|
|
2018 |
|
|
[58]
|
PRIORITIZATION OF SINGLE ORDERS IN A MANUFACTURING–SERVICE ENTERPRISE WITH APPLICATION OF THE AHP METHOD
|
|
2018 |
|
|
[59]
|
Design of mathematical models assessment of working achievements based on spencer competency in PT. Z
|
|
IOP Conference Series: Materials Science and Engineering,
2018 |
|
|
[60]
|
Analisis Penentuan Nilai Robot pada Metode Simple Additive Weigting (SAW) dengan Menggunakan Metode Analytic Hierarchy Process (AHP)
|
|
2018 |
|
|
[61]
|
Comparison AHP and SAW to promotion of head major department SMK Muhammadiyah 04 Medan
|
|
Journal of Physics: Conference Series,
2018 |
|
|
[62]
|
TODA: Software for Multiple-Criteria Decisions
|
|
International Journal of Decision Support System Technology (IJDSST),
2018 |
|
|
[63]
|
Метод аналізу ієрархій для вибору раціонального обладнання термічного знешкодження відходів
|
|
2018 |
|
|
[64]
|
SELECTION OF CONTRACTOR USING ANALYTICAL HIERARCHY PROCESS (AHP)
|
|
2018 |
|
|
[65]
|
Strategi Pengembangan Usaha dengan Metode Fuzzy SWOT dan Fuzzy Analytical Hierarchy Process (Studi Kasus di UKM Sambal Pecel Kabupaten …
|
|
2018 |
|
|
[66]
|
APPLICATION OF THE ANALYTICAL HIERARCHY PROCESS (AHP) FOR PACKAGING SELECTION OF THE BALINESE FOOD “LEDOK”
|
|
2017 |
|
|
[67]
|
THE IMPACT OF INCOMPETENT CONTRACTOR ON THE PROJECT SCHEDULE
|
|
Journal of Engineering and Sustainable Development,
2017 |
|
|
[68]
|
A Selection Method In Construction Project Management Using Analytic Network Process (ANP) As A Tool In Decision
|
|
2017 |
|
|
[69]
|
應用層級分析法探討高中職學生選系因素--以南部某私立大學進修部為例
|
|
臺灣義守大學學位論文,
2017 |
|
|
[70]
|
TECHNICAL TENDER EVALUATION USING ANALYTICAL HIERARCHY PROCESS (AHP)
|
|
2017 |
|
|
[71]
|
A Framework for Value Engineering Methodology Application Using Building Information Modeling (BIM)
|
|
2017 |
|
|
[72]
|
Designing Model of Performance Measurement System of Small and Medium Scale Industry Employees in Ciamis Regency
|
|
European Journal of Business and Management,
2017 |
|
|
[73]
|
Pre-Qualification Of Contractors For High-Rise Building Projects In Philippines: A Selection Method In Construction Management Using Analytic Hierarchy …
|
|
2016 |
|
|
[74]
|
基于可变模糊决策模型的 EPC 项目总承包商选择研究
|
|
2016 |
|
|
[75]
|
Pre-Qualification Of Contractors For High-Rise Building Projects In Philippines: A Selection Method In Construction Management Using Analytic Hierarchy …
|
|
2016 |
|
|
[76]
|
ANALYTICAL HIERARCHICAL PROCESS (AHP) AND FUZZY AHP APPLICATIONS-A REVIEW PAPER
|
|
International Journal of Pharmacy & Technology,
2016 |
|
|
[77]
|
Assessment of Environmental Impact of Design Variants Production Hall Roof, Including the Life Cycle of the Building
|
|
|
|
|
[78]
|
Contractor Selection Criteria and Road Construction Project Success in Rivers State
|
|
|
|
|