Engineering

Volume 1, Issue 1 (June 2009)

ISSN Print: 1947-3931   ISSN Online: 1947-394X

Google-based Impact Factor: 0.66  Citations  

The Effect of Price Discount on Time-Cost Trade-off Problem Using Genetic Algorithm

HTML  Download Download as PDF (Size: 108KB)  PP. 33-40  
DOI: 10.4236/eng.2009.11005    6,718 Downloads   12,162 Views  Citations

Affiliation(s)

.

ABSTRACT

Time-cost trade off problem (TCTP), known in the literature as project crashing problem (PCP) and project speeding up problem (PSP) is a part of project management in planning phase. In this problem, determining the optimal levels of activity durations and activity costs which satisfy the project goal(s), leads to a balance between the project completion time and the project total cost. A large amount of literature has studied this problem under various behavior of cost function. But, in all of them, influence of discount has not been in-vestigated. Hence, in this paper, TCTP would be studied considering the influence of discount on the re-source price, using genetic algorithm (GA). The performance of proposed idea has been tested on a medium scale test problem and several computational experiments have been conducted to investigate the appropriate levels of proposed GA considering accuracy and computational time.

Share and Cite:

H. Mokhtari and A. Aghaie, "The Effect of Price Discount on Time-Cost Trade-off Problem Using Genetic Algorithm," Engineering, Vol. 1 No. 1, 2009, pp. 33-40. doi: 10.4236/eng.2009.11005.

Cited by

[1] Developing of a mathematical optimization model with profit, time and risk trade-off in project scheduling
Journal of Management …, 2020
[2] Presenting a goal programming model in the time-cost-quality trade-off
International Journal of Construction Management, 2018
[3] تحليل پيشرفت پروژه جهت موازنه زمان و هزينه با استفاده از مدل سازي اماري با اعداد خاکستري‎
دومين کنفرانس ملي محاسبات نرم, 2017
[4] بررسی مدل‌های موازنه (هزینه-زمان-کیفیت) در مدیریت پروژه‌ها‎
2016
[5] EXPERIMENTAL DESIGN FOR GENETIC ALGORITHM SIMULATED ANNEALING FOR TIME COST TRADE-OFF PROBLEMS
?H Bettemir - ijeas.akdeniz.edu.tr, 2013
[6] A grey mathematical programming model to time-cost trade-offs in project management under uncertainty
Grey Systems and Intelligent Services (GSIS), 2011 IEEE International Conference on. IEEE, 2011., 2011
[7] Experimental design for genetic algorithm simulated annealing for time-cost trade-off problems
2011

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.