American Journal of Operations Research

Volume 2, Issue 2 (June 2012)

ISSN Print: 2160-8830   ISSN Online: 2160-8849

Google-based Impact Factor: 0.84  Citations  

A Production Inventory Model with Shortages, Fuzzy Preparation Time and Variable Production and Demand

HTML  Download Download as PDF (Size: 287KB)  PP. 183-192  
DOI: 10.4236/ajor.2012.22021    6,468 Downloads   11,879 Views  Citations

ABSTRACT

A production inventory model is formulated for a single item. Here, demand varies with the on-hand inventory level and production price. Shortages are allowed and fully backlogged. The time gap between the decision and actual commencement of production is termed as “preparation time” and is assumed to be crisp/imprecise in nature. The set-up cost depends on preparation time. The fuzzy preparation time is reduced to a crisp interval preparation time using nearest interval approximation and following the interval arithmetic, the reduced problem is converted to a multi-objective optimization problem. Mathematical analysis has been made for single objective crisp model (Model-I). Numerical illustration have been made for both crisp (Model-I) and fuzzy (Model-II) models. Model-I is solved by generalized reduced gradient technique and multi-objective model (Model-II) by Global Criteria Method. Sensitivity analyses have been made for some parameters of Model-I.

Share and Cite:

N. Mahapatra, U. Bera and M. Maiti, "A Production Inventory Model with Shortages, Fuzzy Preparation Time and Variable Production and Demand," American Journal of Operations Research, Vol. 2 No. 2, 2012, pp. 183-192. doi: 10.4236/ajor.2012.22021.

Cited by

[1] A production-repairing inventory model considering demand and the proportion of defective items as rough intervals
2021
[2] An EPQ model with stock and selling price dependent demand and variable production rate in interval environment
International Journal of System Assurance Engineering and Management, 2019
[3] An inventory decision-making model considering continuous production and detection of electric energy metering device
International Journal of Manufacturing Technology and Management, 2018
[4] AN INVENTORY MODEL WITH VARIABLE HOLDING COST AND PARTIAL BACKLOGGING UNDER INTERVAL UNCERTAINTY: GLOBAL CRITERIA METHOD
International Journal of Mechanical Engineering and Technology, 2018
[5] A single-vendor single-buyer supply chain coordination model with price discount and benefit sharing in fuzzy environment
International Journal of Management Studies, 2018
[6] A Fuzzy Production Inventory Model in an Agricultural Field with Random Demand Rate
2018
[7] Fuzzy Inventory Model for Slow and Fast Growing Items with Deterioration Constraints in a Single Period
2017
[8] Fuzzy Optimization of Multi Item Inventory Model with Imprecise Production and Demand
International Journal of Computational and Applied Mathematics [IJCAM], 2017
[9] A research on logistics model of electric energy metering device considering its continuous detection process
2016
[10] Fuzzy non-instantaneous deteriorating inventory model with probabilistic production, demand and time dependent deterioration rate
2016
[11] Optimization of inventory model With fuzzy unit price under possible Constraints
2015
[12] A partial backlogging inventory model for deteriorating items with time-varying demand and holding cost: An interval number approach
Croatian Operational Research Review, 2015

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.