Dye Test within Mosul Dam Area

HTML  XML Download Download as PDF (Size: 3807KB)  PP. 267-286  
DOI: 10.4236/eng.2021.136020    214 Downloads   928 Views  

ABSTRACT

Mosul Dam is located on the River Tigris about 60 km north of Mosul city in Iraq. The dam is a multipurpose earth fill dam with a storage capacity of 11.11 million cubic meters, which was in operation since 1986. During the first impounding of its reservoir, seepage of water underneath the foundation of dam was noticed due to the desolation of gypsum beds. This raised concern about the stability of the dam and since then grouting operation were carried out. ISIS occupied the dam 8 - 16 August 2014. Grouting operations stopped and number of equipment and buildings were destroyed during that short period. After the defeat of ISIS, the Iraqi Ministry of Water Resources rebuilt and constructed the destroyed parts within the site and a new maintenance operations program was adopted. New training courses for the staff of Mosul Dam were conducted with Trevi Company and US Army Corps of Engineers. In this paper, the dye test is highlighted to monitor the seepage of groundwater within the dam site. It seems that the dam is stable in its present conditions and water level height.

Share and Cite:

Safi, M. and Al-Ansari, N. (2021) Dye Test within Mosul Dam Area. Engineering, 13, 267-286. doi: 10.4236/eng.2021.136020.

Cited by

No relevant information.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.