[1]
|
R. Panneerselvam, “Production and Operations Management,” 2nd Edition, PHI Learning Private Limited, New Delhi, 2005.
|
[2]
|
P. Senthilkumar and S. Narayanan, “Literature Review of Single Machine Scheduling Problem with Uniform Parallel Machines,” Intelligent Information Management, Vol. 2, No. 8, 2010, pp. 457-474.
doi:10.4236/iim.2010.28056
|
[3]
|
P. De and T. E. Morton, “Scheduling to Minimize Make- span on Unequal Parallel Processors,” Decision Sciences, Vol. 11, No. 4, 1980, pp. 586-602.
doi:10.1111/j.1540-5915.1980.tb01163.x
|
[4]
|
R. L. Bulfin and R. G. Parker, “Scheduling Jobs on Two Facilities to Minimize Makespan,” Management Science, Vol. 26, No. 2, 1980, pp. 202-214.
doi:10.1287/mnsc.26.2.202
|
[5]
|
D. K. Friesen and M. A. Langston, “Bounds for Multifit Scheduling on Uniform Proc-essors,” SIAM Journal on Computing, Vol. 12, No. 1, 1983, pp. 60-70.
doi:10.1137/0212004
|
[6]
|
R. L. Graham, “Bounds for Multi-processing Timing Anomalies,” SIAM Journal of Applied Mathematics, Vol. 17, No. 2, 1969, pp.416-429. doi:10.1137/0117039
|
[7]
|
G. Dobson, “Scheduling Independ-ent Tasks on Uniform Processors,” SIAM Journal of Computing, Vol. 13, No. 4, 1984, pp. 705-716. doi:10.1137/0213044
|
[8]
|
D. K. Friesen, “Tighter Bounds for LPT Scheduling on Uniform Processors,” SIAM Journal on Computing, Vol. 16, No. 3, 1987, pp. 554-560. doi:10.1137/0216037
|
[9]
|
D. S. Hochbaum and D. B. Shmoys, “A Polynomial ApProximation Scheme for Scheduling on Uniform Processors: Using the Dual Approximation Ap-proach,” SIAM Journal on Computing, Vol. 17, No. 3, 1988, pp. 539-551.
doi:10.1137/0217033
|
[10]
|
B. Chen, “Parametric Bounds for LPT Scheduling on Uniform Processors,” Acta Mathematicae Applicateae Sinica, Vol. 7, No. 1, 1991, pp. 67-73.
doi:10.1007/BF02080204
|
[11]
|
P. Mireault, J. B. Orlin and R. V. Vohra, “A Parametric Worst Case Analysis of the LPT Heu-ristic for Two Uniform Machines,” Operations Research, Vol. 45, No. 1, 1997, pp. 116-125. doi:10.1287/opre.45.1.116
|
[12]
|
R. E. Burkard and Y. He, “A Note on MULTIFIT Scheduling for Uniform Machines,” Computing, Vol. 61, No. 3, 1998, pp. 277-283. doi:10.1007/BF02684354
|
[13]
|
R. E. Burkard, Y. He and H. Kellerer, “A Linear Compound Algorithm for Uniform Ma-chine Scheduling,” Computing, Vol. 61, No. 1, 1998, pp. 1-9.
|
[14]
|
R. Panneerselvam and S. Kanagalingam, “Modelling Parallel Processors with Different Processing Speeds of Single Machine Scheduling Problem to Minimize Makespan,” Indus-trial Engineering Journal, Vol. 17, No. 6, 1998, pp. 16-19.
|
[15]
|
R. Panneerselvam and S. Kanagalingam, “Simple Heuristic for Single Machine Scheduling Problem with Two Parallel Processors Having Varying Speeds to Minimize Makespan,” Industrial Engineering Journal, Vol. 18, No. 6, 1999, pp. 2-8.
|
[16]
|
A. Agarwal, S. Colak, V. S. Jacob and H. Pirkul, “Heuristics and Augmented Neural Networks for Task Scheduling with Non-identical Machines,” European Journal of Operational Research, Vol. 175, No. 1, 2006, pp. 296- 317. doi:10.1016/j.ejor.2005.03.045
|
[17]
|
P. Senthilkumar and S. Narayanan, “Simulated Annealing Algorithm to Minimize Makespan in Single Machine Scheduling Problem with Uni-form Parallel Machines,” Intelligent Information Management, Vol. 3, No. 1, 2011, pp. 22-31. doi:10.4236/iim.2011.31003
|
[18]
|
C. Mihaila and A. Mihaila, “An Evolutionary Algorithm for Uniform Parallel Machines Scheduling,” 2nd UKSIM European Symposium on Computer Modelling and Simulation, Liverpool, 8-10 September 2008, pp. 76-80.
doi:10.1109/EMS.2008.34
|
[19]
|
A. Mihaila and C. Mihaila, “Uniform Parallel Machines Scheduling Using a Genetic Algo-rithm,” 8th International Conference on Intelligent Systems Design and Applications, Kaohsiung, 26-28 November 2008, pp. 401-406.
|
[20]
|
R. Panneerselvam, “Design and Analysis of Algorithms,” PHI Learning Private Limited, New Delhi, 2007.
|
[21]
|
R. Panneerselvam, “Research Methodology,” PHI Learning Private Limited, New Delhi, 2004.
|