A Collaborative Business Model for Imperfect Process with Setup Cost and Lead Time Reductions

Abstract

This paper develops a collaborative business model for imperfect process with setup cost and lead time reductions. We propose a simple solution procedure to derive the optimal order quantity, lead time, delivery frequency and setup cost. Shortage during the lead time is assumed to be partially backordered. Numerical examples are carried out to show how the proposed model can result in a substantial cost savings over the traditional model.

Share and Cite:

Lo, C. (2013) A Collaborative Business Model for Imperfect Process with Setup Cost and Lead Time Reductions. Open Journal of Social Sciences, 1, 6-11. doi: 10.4236/jss.2013.17002.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Affisco, J. F., Paknejad, M. J., & Nasri, F. (1988). Investing in setup cost reduction in the joint economic lot size model. Proceedings of the Decision Sciences Institute, 1126-1129.
[2] Affisco, J. F., Paknejad, M. J., & Nasri, F. (2002). Quality improvement and setup cost reduction in the joint economic lot size model. European Journal of Operational Research, 142, 497-508. http://dx.doi.org/10.1016/S0377-2217(01)00308-3
[3] Ballou, R. H. (2004). Business Logistics/Supply Chain Management. Upper Saddle River: Pearson Education.
[4] Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292-311. http://dx.doi.org/10.1111/j.1540-5915.1986.tb00228.x
[5] Ben-Daya, M., & Raouf, A. (1994). Inventory models involving lead time as a decision variable. Journal of the Operational Research Society, 45, 579-582.
[6] Ben-Daya, M., & Hariga, M. (2003). Lead-time reduction in a stochastic inventory system with learning consideration, International Journal of Production Research, 41, 571-579. http://dx.doi.org/10.1080/00207540210158807
[7] Chen, C. K., Chang, H. C., & Ouyang, L. Y. (2001). A continuous review inventory model with ordering cost dependent on lead time. International Journal of Information and Management Sciences, 12, 1- 13.
[8] Chung, K. J., & Huang, Y. F. (2006). Retailer’s optimal cycle times in the EOQ model with imperfect quality and a permissible credit period. Quality and Quantity, 40, 59-77. http://dx.doi.org/10.1007/s11135-005-5356-z
[9] Goyal, S. K. (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15, 107-111. http://dx.doi.org/10.1080/00207547708943107
[10] Goyal, S. K. (1988). A joint economic-lot-size model for purchaser and vendor: A comment. Decision Sciences, 19, 236-241. http://dx.doi.org/10.1111/j.1540-5915.1988.tb00264.x
[11] Goyal, S. K., Huang, C. K., & Chen, K. C. (2003). A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning & Control, 14, 596- 602. http://dx.doi.org/10.1080/09537280310001626188
[12] Ha, D. & Kim, S. L. (2003). A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage. International Journal of Production Economics, 86, 1-10. http://dx.doi.org/10.1016/S0925-5273(03)00006-9
[13] Hariga, M. (1999). A stochastic inventory model with lead time and lot size interaction. Production Planning and Control, 10, 434-438. http://dx.doi.org/10.1080/095372899232957
[14] Hill, R. M. (1997). The single-vendor single-buyer integrated production inventory model with a generalized policy. European Journal of Operational Research, 97, 493-499. http://dx.doi.org/10.1016/S0377-2217(96)00267-6
[15] Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91-98. http://dx.doi.org/10.1016/S0925-5273(03)00220-2
[16] Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312-323. http://dx.doi.org/10.1016/0377-2217(93)E0253-T
[17] Nasri, F., Paknejad, M. J., & Affisco, J. F. (1991). Simultaneous investment in setup cost and order cost reduction in the joint economic lot size model. Proceedings of the Northeast Decision Sciences Institute, 263-267.
[18] Ouyang, L. Y., Yeh, N. C., & Wu, K. S. (1996). Mixture inventory model with backorders and lost sales for variable lead time. Journal of the Operational Research Society, 47, 829-832.
[19] Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2004). Integrated vendor-buyer cooperative model with stochastic demand in controllable lead time. International Journal of Production Economics, 92, 255-266. http://dx.doi.org/10.1016/j.ijpe.2003.10.016
[20] Pan, J. C. H., & Yang, J. S. (2002). A study of an integrated inventory model with controllable lead time. International Journal of Production Research, 40, 1263-1273. http://dx.doi.org/10.1080/00207540110105680
[21] Papachristos, S., & Konstantaras, I. (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100, 148-154. http://dx.doi.org/10.1016/j.ijpe.2004.11.004
[22] Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137-144. http://dx.doi.org/10.1287/opre.34.1.137
[23] Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59-64. http://dx.doi.org/10.1016/S0925-5273(99)00044-4
[24] Yang, P. C. & Wee, H. M. (2000). Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach. Production Planning and Control, 11, 474-480. http://dx.doi.org/10.1080/09537280050051979

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.