[1]
|
J. Chod and N. Rudi, “Resource Flexibility with Responsive Pricing,” Operations Research, Vol. 53, No. 3, 2005, pp. 532-548. doi:10.1287/opre.1040.0191
|
[2]
|
A. O. Brown, H. L. Lee and R. Petrankan, “Xilinx Improves Its Semiconductor Supply Chain Using Product and Process Postponement,” Interface, Vol. 30, No. 4, 2000, pp. 65-80. doi:10.1287/inte.30.4.65.11650
|
[3]
|
R. I. Van Hoek, “The Rediscovery of Postponement a Literature Review and Directions for Research,” Journal of Operations Management, Vol. 19, No. 2, 2001, pp. 161-184. doi:10.1016/S0272-6963(00)00057-7
|
[4]
|
B. Yang, N. D. Burns and C. J. Backhouse, “Postponement: A Review and an Integrated Framework,” International Journal of Operations & Production Management, Vol. 24, No. 5, 2004, pp. 468-487.
doi:10.1108/01443570410532542
|
[5]
|
C. A. Boone, C. W. Craighead and J. B. Hanna, “Postponement: An Evolving Supply Chain Concept,” International Journal of Physical Distribution & Logistics Management, Vol. 37, No. 8, 2007, pp. 594-611.
doi:10.1108/09600030710825676
|
[6]
|
W. Zinn and D. J. Bowersox, “Planning Physical Distribution with the Principle of Postponement,” Journal of Business Logistics, Vol. 9, No. 2, 1988, pp. 117-136.
http://worldcat.org/oclc/4304746
|
[7]
|
B. Yang, N. D. Burns and C. J. Backhouse, “The Application of Postponement in Industry,” IEEE Transactions on Engineering Management, Vol. 52, No. 2, 2005, pp. 238-258. doi:10.1109/TEM.2005.845223
|
[8]
|
J. Li, T. C. E. Cheng and S. Y. Wang, “Analysis of Postponement Strategy for Perishable Items by EOQ-Based Models,” International Journal of Production Economics, Vol. 107, No. 1, 2007, pp. 31-38.
|
[9]
|
S. W. Bibhushan, K. S. Bhoon and F. T. S. Chan, “Postponement Strategies for Re-Engineering of Automotive Manufacturing: Knowledge-Management Implications,” International Journal of Advanced Manufacturing Technology, Vol. 39, No. 3-4, 2008, pp. 367-387.
doi:10.1007/s00170-006-0679-z
|
[10]
|
D. Kisperska-Moron and A. Swierczek, “The Elected Determinants of Manufacturing Postponement within Supply Chain Context: An International Study,” International Journal of Production Economics, Vol. 133, No. 1, 2011, pp. 192-200. doi:10.1016/j.ijpe.2010.09.018
|
[11]
|
R. I. Van Hoek, “Postponed Manufacturing: A Case Study in the Food Supply,” Supply Chain Management: An International Journal, Vol. 2, No. 2, 1997, pp. 63-75.
doi:10.1108/13598549710166113
|
[12]
|
H. L. Lee, C. Billington and B. Carter, “Hewlett-Packard Gains Control of Inventory and Service through Design for Localization,” Interfaces, Vol. 23, No. 4, 1993, pp. 1-11. doi:10.1287/inte.23.4.1
|
[13]
|
M. Reimann, “Accurate Response by Postponement,” European Journal of Operational Research, Vol. 220, 2012, No. 3, pp. 619-628. doi:10.1016/j.ejor.2012.02.022
|
[14]
|
E. M. Jewkes and A. S. Alf, “A Queueing Model of Delayed Product Differentiation,” European Journal of Operational Research, Vol. 199, No. 3, 2009, pp. 734-743.
doi:10.1016/j.ejor.2008.08.001
|
[15]
|
H. L. Lee, “Effective Inventory and Service Management through Product and Process Redesign,” Operations Research, Vol. 44, No. 1, 1996, pp. 151-159.
|
[16]
|
H. L. Lee and C. Tang, “Modeling the Costs and Benefits of Delayed Product Differentiation,” Management Science, Vol. 43, No. 1, 1997, pp. 40-53.
doi:10.1287/mnsc.43.1.40
|
[17]
|
C. Yeh and H.-C. Yang, “A Cost Model for Determining Dyeing Postponement in Garment Supply Chain,” International Journal of Advanced Manufacturing Technology, Vol. 22, No. 1-2, 2003, pp. 134-140.
doi:10.1007/s00170-002-1453-5
|
[18]
|
H. Haapasalo, “Fast Production for Order Fulfillment: Implementing Mass Customization in Electronics Industry,” International Journal of Production Economics, Vol. 90, No. 2, 2004, pp. 213-222.
doi:10.1016/S0925-5273(03)00214-7
|
[19]
|
J. Uskonen and A. Tenhi?l?, “The Price of Responsiveness: Cost Analysis of Change Orders in Make-To-Order Manufacturing,” International Journal of Production Economics, Vol. 135, No. 1, 2012, pp. 420-429.
doi:10.1016/j.ijpe.2011.08.016
|
[20]
|
J. C. P. Su, Y.-L. Chang and M. Ferguson, “Evaluation of Postponement Structures to Accommodate Mass Customization,” Journal of Operations Management, Vol. 23, No. 3-4, 2005, pp. 305-318.
doi:10.1016/j.jom.2004.10.016
|