Energy planning must anticipate the development and strengthening of power grids, power plants construction times, and the provision of energy resources with the aim of increasing security of supply and its quality. This work presents a methodology for predicting power peaks in mainland Spain’s system in the decade 2011-2020. Forecasts of total electricity demand of Spanish energy authorities set the boundary conditions. The accuracy of the results has successfully been compared with records of demand (2000-2010) and with various predictions published. Three patterns have been observed: 1) efficiency in the winter peak; 2) increasing trend in the summer peak; 3) increasing trend in the annual valley of demand. By 2020, 58.1 GW and 53.0 GW are expected, respectively, as winter and summer peaks in a business-as-usual scenario. If the observed tendencies continue, former values can go down to 55.5 GW in winter and go up to 54.7 GW in summer. The annual minimum valley of demand will raise 5.5 GW, up to 23.4 GW. These detailed predictions can be very useful to identify the types of power plants needed to have an optimum structure in the electricity industry.

Share and Cite:

F. Moreno, "Characterization of Peaks and Valleys of Electricity Demand. Application to the Spanish Mainland System in the Period 2000-2020," Energy and Power Engineering, Vol. 3 No. 4, 2011, pp. 537-546. doi: 10.4236/epe.2011.34066.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] C. García-Ascanio and C. Maté, “Electric Power Demand Forecasting Using Interval Time Series: A Comparison between VAR and iMLP,” Energy Policy, Vol. 38, No. 2, 2010, pp. 715-725. doi:10.1016/j.enpol.2009.10.007
[2] W. Soontornrangson, D. G. Evans, R. J. Fullerc and D. F. Stewart, “Scenario Planning for Electricity Supply,” Energy Policy, Vol. 31, No. 15, 2003, pp. 1647-1659. doi:10.1016/S0301-4215(02)00231-8
[3] M. Mehra and A. Bharadwaj, “Demand Forecasting for Electricity. Tata Energy Research Institute, New Delhi, India,” Proceedings of the National Conference on Regulation in Infrastructure Services: Progress and Way Forward, 14-15 November 2000, New Delhi.
[4] Spanish Industry Office, “Planning of electricity and gas 2008-2016. Development of transmission networks”, 2008. http://www.mityc.es/energia/planificacion/Planificacionelectricidadygas/Desarrollo2008/DocTransportes/planifi-cacion2008_2016.pdf
[5] Spanish Industry Office, “Royal Decree 325/2008 and Royal Decree 326/2008, February 29th, 2008”. Spain’s Official Journal, BOE No. 55, March 4th, 2008, pp. 13079-13091.http://www.boe.es/boe/dias/2011/02/25/pdfs/BOE-A-2011-3693.pdf
[6] Spanish Industry Office, “Royal Decree 661/2007, May 25th, 2007”. Spain’s Official Journal, BOE No. 126, May, 26th, 2007, pp. 22846-22886. http://www.boe.es/boe/dias/2007/05/26/pdfs/A22846-22886.pdf
[7] Spanish Industry Office, “Order ITC/2794/2007, September 27th, 2007”. Spain’s Official Journal, BOE No. 234, September 29th, 2007, pp. 39690-39698. http://www.boe.es/boe/dias/2007/09/29/pdfs/A39690-39698.pdf
[8] F. Castro-Rodríguez, P. L. Marín and G. Siotis, “Capacity Choices in Liberalized Electricity Markets,” Energy Policy, Vol. 37, No. 7, 2009, pp. 2574-2581. doi:10.1016/j.enpol.2009.01.038
[9] L. de Vries and P. Heijnen, “The Impact of Electricity Market Design upon Investment under Uncertainty: The Effectiveness of Capacity Mechanisms,” Utilities Policy, Vol. 16, No 3, 2008, 215-227. doi:10.1016/j.jup.2007.12.002
[10] Spanish Industry Office, “Order ITC/3801/ 2008, December 26th, 2008”. Spain’s Official Journal, BOE No. 315, December 31st, 2008, pp. 52672-52685. http://www.boe.es/boe/dias/2008/12/31/pdfs/A52672-52685.pdf
[11] Spanish Industry Office, “Order ITC/1723/2009, June 26th, 2009”. Spain’s Official Journal, BOE No. 156, June 29th, 2009, pp. 53812-53821. http://www.boe.es/boe/dias/2009/06/29/pdfs/BOE-A-2009-10670.pdf
[12] Spanish Industry Office, “Royal Decree 1634/2006, December 29th, 2006”. Spain’s Official Journal, BOE No. 312, December 30th, 2006, pp. 46656-46679. http://www.boe.es/boe/dias/2006/12/30/pdfs/A46656-46679.pdf
[13] Spanish Industry Office, “Order ITC/2370/2007, July 26th, 2009”. Spain’s Official Journal, BOE No. 185, August 3rd, 2007, pp. 33442-33451. www.boe.es/boe/dias/2007/08/03/pdfs/A33442-33451.pdf
[14] Spanish Electricity System Operator (Red Eléctrica de Espa?a, S.A.), “Spanish electricity system 09”, 2010. http://www.ree.es/sistema_electrico/pdf/infosis/Inf_Sis_Elec_REE_2009.pdf
[15] N. Hopper, C. Goldman, R. Bharvirkar and D. Engel, “The Summer of 2006: A Milestone in the Ongoing Maturation of Demand Response,” The Electricity Journal, Vol. 20, No. 5, 2007, pp. 62-75. doi:10.1016/j.tej.2007.04.007
[16] H.-P. Chao, “Price-Responsive Demand Management for a Smart Grid World,” The Electricity Journal, Vol. 23, No. 1, 2010, pp. 7-20. doi:10.1016/j.tej.2009.12.007
[17] H. Fraser, “The Importance of an Active Demand Side in the Electricity Industry,” The Electricity Journal, Vol. 14, No. 9, 2001, pp. 52-73. doi:10.1016/S1040-6190(01)00249-4
[18] A. Sheffrin, H. Yoshimura, D. LaPlante and B. Neenan, “Harnessing the Power of Demand,” The Electricity Journal, Vol. 21, No. 2, 2008, pp. 39-50. doi:10.1016/j.tej.2008.02.002
[19] C. Rochlin, “The Alchemy of Demand Response: Turning Demand into Supply,” The Electricity Journal, Vol. 22, No. 9, 2009, pp. 10-25. doi:10.1016/j.tej.2009.09.004
[20] Spanish Institute for Energy Diversification and Saving (IDAE) “National Action Plan for Renewable Energy in Spain (PANER) 2011-2020”, 2010. http://www.idae.es/index.php/mod.documentos/mem.descarga?file=/documentos_20100630_PANER_Espana_version_final_[1]_cdb842de.pdf
[21] C. von Hirschhausen and M. Andres, “Long-Term Electricity Demand in China - From Quantitative to Qualitative Growth?” Energy Policy, Vol. 28, No. 4, 2000, pp. 231-241. doi:10.1016/S0301-4215(00)00014-8
[22] R. Mamlook, O. Badran and E. Abdulhadi, “A Fuzzy Inference Model for Short-Term Load Forecasting,” Energy Policy, Vol. 37, No. 4, 2009, pp. 1239-1248. doi:10.1016/j.enpol.2008.10.051
[23] J.-S. Huang and J.-H. Wu, “A Portfolio Risk Analysis on Electricity Supply Planning,” Energy Policy, Vol. 36, No. 2, 2008, pp. 627-641. doi:10.1016/j.enpol.2007.10.004
[24] Spanish Electricity System Operator (Red Eléctrica de Espa?a, S.A.), “INDEL Project. Atlas of Spanish electricity demand, 1998. http://www.ree.es/sistema_electrico/pdf/indel/atlas_indel_ree.pdf.
[25] D. Keles, D. M?st and W. Fichtner, “The Development of the German Energy Market until 2030-A Critical Survey of Selected Scenarios,” Energy Policy, Vol. 39, No. 2, 2011, pp. 812-825. doi:10.1016/j.enpol.2010.10.055
[26] M. Hekkenberg, R. M. J. Benders, H. C. Moll and A. J. M. S. Uiterkamp, “Indications for a Changing Electricity Demand Pattern: The Temperature Dependence of Electricity Demand in the Netherlands,” Energy Policy, Vol. 37, No. 4, 2009, pp. 1542-1551. doi:10.1016/j.enpol.2008.12.030
[27] D. C. Mountain and E. L. Lawson, “Some Initial Evidence of Canadian Responsiveness to Time-of-Use Electricity Rates: Detailed Daily and Monthly Analysis,” Resource and Energy Economics, Vol. 17, No. 2, 1995, pp. 189-212. doi:10.1016/0928-7655(94)00025-F
[28] Spanish Industry Office, “Royal Decree 1164/2001, October 26th, 2001”. Spain’s Official Journal, BOE No. 268, November 8th, 2001, pp. 40618-40629. http://www.boe.es/boe/dias/2001/11/08/pdfs/A40618-40629.pdf
[29] E. González-Romera, M. A. Jaramillo-Maron and D. Carmona-Fernández, “Forecasting of the Electric Energy Demand Trend and Monthly Fluctuation with Neural Net- Work,” Computers and Industrial Engineering, Vol. 52, No. 3, 2007, pp. 336-343. doi:10.1016/j.cie.2006.12.010
[30] Spanish Gas System Operator (ENAGAS), “The Spanish gas sytem. 2009 report”, 2010. http://www.enagas.es/cs/Satellite?blobcol=urldata&blobheader=application%2Fpdf&blobkey=id&blobtable=MungoBlobs&blobwhere=1146251952834&ssbinary=true.
[31] National Meteorological Agency, “2009, the Third Warmest Year”, 2010. http://www.aemet.es/en/noticias/2009/12/avanceclima09
[32] Spanish Association of Electricity Industries (UNESA), “Electricity Report - Activity Report - Statistical Report 2009 http://www.unesa.es/documentos_biblioteca/memoria_estadistica/cap_0_2008.pdf.
[33] Spanish Electricity System Operator (Red Eléctrica de Espa?a, S.A.), “Spanish Electricity System. Advance of 2010 Report”, 2010. http://www.ree.es/sistema_electrico/pdf/infosis/Avance_REE_2010.pdf
[34] P. Narayan and S. Popp, “Can the Electricity Market be Characterised by Asymmetric Behaviour?” Energy Policy, Vol. 37, No. 11, 2009, pp. 4364-4372. doi:10.1016/j.enpol.2009.05.051
[35] Spanish Secretary of State for Energy, Industrial Development and Small and Medium Enterprises, “Resolution, March 17th, 2004”. Spain’s Official Journal, BOE No. 92, April 16th, 2004, pp. 15890-15916. http://www.boe.es/boe/dias/2004/04/16/pdfs/A15890-15916.pdf
[36] Spanish National Energy Comission, “Informe marco sobre la demanda de energía eléctrica y gas natural, y su cobertura”, years 2005, 2009 and 2011.http://www.cne.es
[37] Spanish General Directorate of Energy Policy and Mines, “Resolution, December 19th, 2008”. Spain’s Official Journal, BOE No. 314, December 30th, 2009, pp. 52435-52435. http://www.boe.es/boe/dias/2008/12/30/pdfs/A52435-52435.pdf
[38] J. Torriti, M. G. Hassan and M. Leach, “Demand Response Experience in Europe: Policies, Programmes and Implementation,” Energy, Vol. 35, No. 4, 2009, pp. 1575-1583. doi:10.1016/j.energy.2009.05.021
[39] K. Spees and L. B. Lave, “Demand Response and Electricity Market Efficiency,” The Electricity Journal, Vol. 20, No. 3, 2007, pp. 69-85. doi:10.1016/j.tej.2007.01.006

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.