Share This Article:

Analyzing the Impact of Different Factors on Software Cost Estimation in Today’s Scenario

Full-Text HTML XML Download Download as PDF (Size:366KB) PP. 245-251
DOI: 10.4236/jsea.2015.85025    3,239 Downloads   3,624 Views   Citations

ABSTRACT

Software cost estimation is a main concern of the software industry. However, the fact is also that in today’s scenario, software industries are more interested in other issues like new technologies in the market, shorter development time, skill shortage etc. They are actually deviating from critical issues to routine issues. Today, people expect high quality products at very low costs and same is the goal of software engineering. An accuracy in software cost estimation has a direct impact on company’s reputation and also affects the software investment decisions. Accurate cost estimation can minimize the unnecessary costs and increase the productivity and efficiency of the company. The objective of this paper is to identify the existing methods of software cost estimation prevailing in the market and analyzing some of the important factors impacting the software cost estimation process. In order to achieve the objective, a survey was conducted to find out:

Nature of projects that companies prefer.

Impact of training on employees in software cost estimation.

How many people review the estimated cost?

How much risk buffer the company keeps for future prospects?

Cite this paper

Gangwani, D. and Mukherjee, S. (2015) Analyzing the Impact of Different Factors on Software Cost Estimation in Today’s Scenario. Journal of Software Engineering and Applications, 8, 245-251. doi: 10.4236/jsea.2015.85025.

References

[1] Popovic, J. and Bojic, D. (2012) A Comparative Evaluation of Effort Estimation Methods in the Software Life Cycle. ComSIS, 9, 455-484.
[2] Moløkken, K. and Jorgensen, M. (2003) A Review of Software Surveys on Software Effort Estimation. International Symposium on Empirical Software Engineering, Rome, 30 September-1 October 2003, 223-230. http://dx.doi.org/10.1109/ISESE.2003.1237981
[3] Boehm, B. (1981) Software Engineering Economics. Prentice-Hall, Upper Saddle River.
[4] Yogesh, K. (2014) A Review on Effort Estimation Techniques used in Software Projects. IJCSMS International Journal of Computer Science & Management Studies, 14, 25-31.
[5] Khatibi, V. and Jawawi, D.N.A. (2010) Software Cost Estimation Methods: A Review. Journal of Emerging Trends in Computing and Information Sciences, 2, 21-29.
[6] Luschen, T. (2012) Fixed Bid vs. Time and Materials—Pros and Cons.
http://www.sundoginteractive.com/sunblog/posts/fixed-bid-vs.-time-and-materials-pros-and-cons
[7] Education Portal, Study.com, Cost Estimating Courses with Training& Degree Program Info.
http://education-portal.com/articles/Cost_Estimating_Courses_Overview_with_Training_and_Degree _Program_Information.html
[8] Galorath, D. (2008) Step: Estimate Validation and Review.
http://www.galorath.com/wp/step-seven-estimate-validation-and-review.php
[9] Wiegers, K. (2002) Saving for a Rainy Day.
http://www.ibm.com/developerworks/rational/library/content/RationalEdge/apr02/RainyDayApr02.pdf

  
comments powered by Disqus

Copyright © 2017 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.