Obstacles Facing Developing Countries in Power System Planning

Abstract

The problem of power system planning, due to its complexity and dimensionality, is one of the most challenging problems facing the electric power industry in developing as well as developed countries. In planning phase, two of the most important decision-making parameters are the reliability and costs. The latter includes both system investment costs and outages costs. In this paper, these parameters are described and the interrelation between them is evaluated. Some previous approaches and developed techniques will he applied to a particular planning problem in a developing country and some aspects having a significant impact on the decision making process in the planning phase will be considered.

Share and Cite:

Al-Shaalan, A. (2015) Obstacles Facing Developing Countries in Power System Planning. Journal of Power and Energy Engineering, 3, 7-15. doi: 10.4236/jpee.2015.34002.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Covarrubias, A.J. (1988) Expert Systems and Power System Planning in Developing Countries. IEEE Conference Proceedings, Southeastcon’88, 11-13 April 1988, 551-555.
[2] Shaalan, A.M. (2011) Essential Aspects of Power System Planning in Developing Countries. Journal of King Saud University—Engineering Sciences, 23, 27-32.
[3] Schramm, G. (1990) Electric Power in Developing Countries: Status, Problems, Prospects. Annual Review of Power, 15, 307-333. http://dx.doi.org/10.1146/annurev.energy.15.1.307
[4] El-Zayyat, H., et al. (1991) Power System Planning in Developing Countries, the Case of Jordan. Mansoura Engineering Journal (MEJ), 16.
[5] Meier, P. (1990) Power Sector Innovation in Developing Countries: Implementing Investment Planning under Capital and Environmental Constraints. Annual Review of Power, 15, 277-306. http://dx.doi.org/10.1146/annurev.eg.15.110190.001425
[6] Agalgaonkar; A.P. and Kulkarni, S.V. (2006) Evaluation of Configuration Plans for DGs in Developing Countries Using Advanced Planning Techniques. IEEE Transaction on Power Systems, 21, 973-981.
[7] Wilbanks, T.J. (1990) Implementing Environmentally Sound Power Sector Strategies in Developing Countries. Annual Review of Power, 15, 255-276. http://dx.doi.org/10.1146/annurev.eg.15.110190.001351
[8] Sadeghzadeh, S.M. and Ansarian, M. (2006) Techno-Economic Power System Planning in Developing Countries. 7th IET International Conference on Advances in Power System Control, Operation and Management (APSCOM), Hong Kong, 30 October-2 November 2006, 216. http://dx.doi.org/10.1049/cp:20062083
[9] Billinton, R. and Allan, R.N. (1984) Reliability Evaluation of Power Systems. Pitman Books, London. http://dx.doi.org/10.1007/978-1-4615-7731-7
[10] Shaalan, A. M. (2012) Reliability Evaluation in Generation Expan-sion Planning Based on the Expected Energy Not Served. Journal of King Saud University (Engineering Sciences), 1.
[11] Shaalan, A.M. (1984) Reliability Evaluation in Long-Range Generation Expansion Planning. PhD Thesis, Victoria University of Manchester, Manchester, UK, April 1984, 51-58.
[12] Rudnick, H. and Quinteros, R. (1998) Power System Planning in the South America Electric Market Restructuring. VI Symposium of Specialists in Electric Operational and Expansion Planning—VI SEPOPE, Bahia, 24-29 May 1998.
[13] Weber, A., et al. (2013) Long-Term Power System Planning in the Context of Changing Policy Objectives. Workgroup for Infrastructure Policy (WIP), University of Technology, Berlin, June 2013.
[14] Flage, R. and Aven, T. (2009) On Treatment of Uncertainty in System Planning. Reliability Engineering & System Safety, 94, 884-890. http://dx.doi.org/10.1016/j.ress.2008.09.011

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.