Preventive Maintenance Characteristics towards Optimal Maintenance Performance: A Case Study of Office Buildings

Abstract

Lack of preventive measure is currently the problem that implicates poor building maintenance performance and issue on sustainability of buildings in Malaysia. Whereby, preventive maintenance is an effective approach to enhance the reliability and quality of a system and its components. This study seeks to investigate the characteristics of preventive maintenance towards the overall performance in building maintenance. Case study approach is adopted to identify the maintenance characteristics and aspects that lead to good performance. The research findings demonstrate that the most significant maintenance characteristics towards overall performance are skill and knowledge of maintenance labour, quality of spare parts and materials, length of predetermined maintenance interval, skill and knowledge of maintenance manager, capability to adopt maintenance equipment and technique, budget allocation for acquisition of maintenance data, reliability of maintenance data, as well as frequency of monitoring and inspection. As a conclusion, the significant maintenance characteristics must be taken into consideration to achieve optimal maintenance performance. In order to improve the effectiveness of maintenance strategy and the maintenance performance, the study recommends practice and provision of communication platform such as meeting and customer satisfaction survey that involves all the key participants from clients to customers.

Share and Cite:

Au-Yong, C. , Ali, A. and Ahmad, F. (2014) Preventive Maintenance Characteristics towards Optimal Maintenance Performance: A Case Study of Office Buildings. World Journal of Engineering and Technology, 2, 1-6. doi: 10.4236/wjet.2014.23B001.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Horner, R.M., El-Haram, M.A. and Munns, A. (1997) Building Maintenance Strategy: A New Management Approach. International Journal of Quality in Maintenance, 3, 273-280.
[2] Ruslan, N. (2007) Campus Facilities Management Experience. In National Asset and Facilities Management (NAFAM) Convention, National Asset and Facility Management Development, Kuala Lumpur, Malaysia, 13 August 2007.
[3] Kamaruzzaman, S.N. and Zawawi, E.M.A. (2010) Development of Facilities Management in Malaysia. Journal of Facilities Management, 8, 75-81. http://dx.doi.org/10.1108/14725961011019094
[4] Moghaddam, K.S. and Usher, J.S. (2010) Optimal Preventive Maintenance and Replacement Schedules with Variable Improvement Factor. Journal of Quality in Maintenance Engineering, 16, 271-287. http://dx.doi.org/10.1108/13552511011072916
[5] Wang, W. and Christer, A.H. (2000) Towards a General Condition Based Maintenance Model for a Stochastic Dynamic System. The Journal of the Operational Research Society, 51, 145-155. http://dx.doi.org/10.1057/palgrave.jors.2600863
[6] Chareonsuk, C., Nagarur, N. and Tabycanon, M.T. (1997) A Multicriteria Approach to the Selection of Preventive Maintenance Intervals. International Journal of Production Economics, 49, 55-64. http://dx.doi.org/10.1016/S0925-5273(96)00113-2
[7] Yang, S.K. (2004) A Condition-Based Preventive Maintenance Arrangement for Thermal Power Plants. Electric Po- wer Systems Research, 72, 49-62. http://dx.doi.org/10.1016/j.epsr.2004.03.007
[8] Fouladgar, M.M., Yazdani-Chamzini, A., Lashgari, A., et al. (2012) Maintenance Strategy Selection Using AHP and COPRAS under Fuzzy Environment. International Journal of Strategic Property Management, 16, 85-104. http://dx.doi.org/10.3846/1648715X.2012.666657
[9] Batun, S. and Azizo?lu, M. (2009) Single Machine Scheduling with Preventive Maintenances. International Journal of Production Research, 47, 1753-1771. http://dx.doi.org/10.1080/00207540701636348
[10] Rao, S.S. (1992) Reliability-Based Design. McGraw-Hill, New York.
[11] Eti, M.C., Ogaji, S.O.T. and Probert, S.D. (2006) Development and Implementation of Preven-tive-Maintenance Practices in Nigerian Industries. Applied Energy, 83, 1163-1179. http://dx.doi.org/10.1016/j.apenergy.2006.01.001
[12] Suttell, R. (2006) Preventive HVAC Maintenance Is a Good Investment. In The Source for Facilities Decision-Makers: Buildings, UNICCO Intergrated Facilities Services, Newton.
[13] Seeley, I.H. (1987) Building Maintenance. 2nd Editon, Palgrave, New York.
[14] Dessouky, Y.M. and Bayer, A. (2002) A Simulation and Design of Experiments Modeling Approach to Minimize Building Maintenance Costs. Computers & Industrial Engineering, 43, 423-436. http://dx.doi.org/10.1016/S0360-8352(02)00056-6
[15] Kwak, R.Y., Takakusagi, A., Sohn, J.Y., et al. (2004) Development of an Optimal Preventive Maintenance Model Based on the Reliability Assessment for Air-Conditioning Facilities in Office Buildings. Building and Environment, 39, 1141-1156. http://dx.doi.org/10.1016/j.buildenv.2004.01.029
[16] Au-Yong, C.P., Ali, A.S. and Ahmad, F. (2014) Significant Characteristics of Scheduled and Condition-Based Maintenance in Office Building. Journal of Performance of Constructed Facilities, 28, 257-263. http://dx.doi.org/10.1061/(ASCE)CF.1943-5509.0000432
[17] Au-Yong, C.P., Ali, A.S. and Ahmad, F. (2013) Office Building Maintenance: Cost Prediction Model. Gradevinar, 65, 803-809.
[18] Au-Yong, C.P., Ali, A.S. and Ahmad, F. (2014) Prediction Cost Maintenance Model of Office Building Based on Condition-Based Maintenance. Eksploatacja i Niezawodnosc—Maintenance and Reliability, 16, 319-324.
[19] Amaratunga, D. and Baldry, D. (2002) Moving from Performance Measurement to Performance Management. Facilities, 20, 217-223. http://dx.doi.org/10.1108/02632770210426701
[20] Sidwell, A.C. (1990) Project Management: Dynamics and Performance. Journal of Construction Management and Economics, 8, 159-178. http://dx.doi.org/10.1080/01446199000000014
[21] Johnson, J. (1995) Choas: The Dollar Drain of IT Project Failures. Application Development Trend, 2, 41-47.
[22] Parida, A. and Kumar, U. (2006) Maintenance Performance Measurement (MPM): Issues and Challenges. Journal of Quality in Maintenance Engineering, 12, 239-251. http://dx.doi.org/10.1108/13552510610685084
[23] Tucker, M. and Pitt, M. (2009) Customer Performance Measure-ment in Facilities Management: A Strategic Approach. International Journal of Productivity and Performance Management, 58, 407-422. http://dx.doi.org/10.1108/17410400910965698
[24] Myeda, N.E., Kamaruzzaman, S.N. and Pitt, M. (2011) Measuring the Performance of Office Buildings Maintenance Management in Malaysia. Journal of Facilities Management, 9, 181-199. http://dx.doi.org/10.1108/14725961111148090
[25] Saunders, M., Lewis, P. and Thornhill, A. (2009) Research Methods for Business Students. 5th Editon, Pearson Education Limited, Essex.
[26] Nik Mat, N.E.M. (2009) Performance Measurement of Office Buildings Maintenance Management. Master Unpub- lished Dissertation, University of Malaya.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.