Modeling Simulation Technology Research for Distribution Network Planning

Abstract

This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, simulating the abnormal condition of distribution network, and presenting operation program of safe, reliable and having simulation record statements. The modeling simulation results show that the software module has lots of advantages including high accuracy, ideal reliability, powerful practicality in simulation and analysis of distribution network, it only need to create once model, the model can sufficiently satisfy multifarious types of simulation analysis required for the distribution network planning.

Share and Cite:

H. Liu, D. Liu and Q. Liu, "Modeling Simulation Technology Research for Distribution Network Planning," Energy and Power Engineering, Vol. 5 No. 4B, 2013, pp. 980-985. doi: 10.4236/epe.2013.54B188.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] L. J. Liu, R. Hu, Y. Fu, et al., “Comprehensive Evaluation of Resource Economy Based Distribution Network Planning Scheme,” Power System Technology, Vol. 32, No. 16, 2008, pp. 66-70.
[2] T. Kong, H. Z. Chen and T. Y. Xu, “Urban Medium-voltage Distribution Network Planning Based on ComGIS Network Analysis and Multi-objective Genetic Algorithm,” Proceedings of the CSEE, Vol. 19, No. 28, 2008, pp. 49-55.
[3] T. Kong, H. Z. Chen, G. Li, et al., “ Review of Power Distribution Network Planning,” Power System Technology, Vol. 19, No. 33, 2009, pp. 92-99.
[4] Q. H. Liu, J. H. Yang and P. Yang, “Distribution Network Planning and Recon-struction Software Based on GIS Component,” Power System Protection and Control, Vol. 38, No. 4, 2010, pp. 106-109.
[5] W. H. Yang, Q. R. Gu and X. Z. Hang, “Attention on the Distribution Power Network Planning During New Period,” Power System Technology, Vol. 30, No. S2, 2006, pp. 588-590.
[6] D. T. C. Wang, L. F. Ochoa and G. P. Harrison, “Modified GA and Data Envelopment Analysis for Multistage Distribution Network Expansion Planning Under Uncertainty,” IEEE Transactions on Power Systems, Vol. 26, No. 2, 2011, pp. 897-904. doi:/10.1109/TPWRS.2010.2057457
[7] C. S. Wang, S. Y. Wang, “The Intelligent Planning of Urban Mid-voltage Distribution Network Based on Spatial GIS Part one Automatic Routing of Radial Network,” Automation of Electric Power Systems, Vol. 28, No. 5, 2004, pp. 45-50.
[8] J. A. Peralta, F. de Leon and J. Mahseredjian, “Unbalanced Multiphase Load-Flow Using a Positive-Sequence Load-Flow Program,” IEEE Transactions on Power Systems, Vol. 23, No. 2, 2008, pp. 469-476. doi:10.1109/TPWRS.2008.920184
[9] Cooper Industry and Power System Division, “CYME Power Engineering Analysis Simulation Software and Solutions,” Cooper Electric (Shanghai) co., LTD, 2011.
[10] M. A. Salam, Koh Ming Jen and M. A. Khan, “Measurement and Simulation of Grounding Resistance with Two and Four Mesh Grids,” Proceedings of IEEE Conference on Power Electronics and Drive Systems (PEDS), Singapore, 2011.
[11] CYMDIST Version 5.02 Reference Manual, Canada: CYME International T&D Inc., 2010.
[12] H. K. Karegar and M. Arabi, “New Wind Turbine Grounding System to Reduce Step & Touch Voltage,” Proceedings of IEEE Conference on Power and Energy (PECon), Kuala Lumpur, Malaysia, 2010.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.