The Design and Improvement of a Software Project Management System Based on CMMI ()
Abstract
The paper researched and analyzed the characteristics, deficiencies and reasons of a management system of a software enterprise project to design a software project management system based on CMMI 1.2, thus helping the enterprise to improve development and management efficiency of software project and reduce the risks and costs on project devel- opment. It studied CMMI model version 1.3 which is recently released by SEI, analyzed its characteristics and told the difference between version 1.2 and version 1.3. In addition, an improvement proposal and a solution of the software project management system were given from multiple perspectives.
Share and Cite:
G. Zhou and W. Shao, "The Design and Improvement of a Software Project Management System Based on CMMI,"
Intelligent Information Management, Vol. 4 No. 6, 2012, pp. 330-337. doi:
10.4236/iim.2012.46037.
Conflicts of Interest
The authors declare no conflicts of interest.
References
[1]
|
P. Weaver, “Effective Project Governance the Tools for Success,” Project Management Institute of New Zealand, Annual Conference, Auckland, 2005.
|
[2]
|
Software Engineering Institution, “What is CMMI?” 2011.
http://www.sei.cmu.edu/cmmi/general
|
[3]
|
Pragma, “ProcessMax for CMMI Level 3,” 2007.
http://www.pragmasystems.com/news/97
|
[4]
|
R. Lin, “The Improvement Method and Standard of CMMI 3 Software Process,” Electronic Industry Press, Beijing, 2003.
|
[5]
|
D. M. Ahern, A. Clouse and R. Turner, “CMMI Distilled,” 3rd Edition, Addison-Wesley Professional, New York, 2008.
|
[6]
|
S. C. Zhong, “A Junior Analysis of the Change of CMMI-DEV1.3 in Process Area Level 2 and 3,” 2011.
http://www.cnies.com/index.aspx
|