[1]
|
R. L. Graham, L. E. Lawler, J. K. Lenstra and A. H. Kan, “Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey,” Annals of Discrete Mathematics, Vol. 5, 1979, pp. 287-326.
|
[2]
|
H. Topcuoglu, S. Harir and M.-Y. Wu, “Performance Effective and Low-Complexity Task Scheduling for Heterogeneous Computing,” IEEE Transactions on Parallel and Distributed Systems, Vol. 13, No. 3, 2002, pp. 260-274. doi:10.1109/71.993206
|
[3]
|
H. EI-Rewini and T. G. Lewis, “Scheduling Parallel Program Tasks onto Arbitrary Target Machines,” Journal of Parallel and Distributed Computing, Vol. 9, No. 2, 1990, pp. 138-153. doi:10.1016/0743-7315(90)90042-N
|
[4]
|
M. Iverson, F. Ozguner and G. Follen, “Parallelizing Existing Applications in a Distributed Heterogeneous Environments,” Proceedings of the Heterogeneous Computing Workshop, 1995, pp. 93-100.
|
[5]
|
H. Topcuoglu, S. Hariri and M. Y. Wu, “Performance Effective and Low-Complexity Task Scheduling for Heterogeneous Computing,” IEEE Transactions on Parallel and Distributed Systems, Vol. 13, No. 3, 2002, pp. 260-274.
|
[6]
|
C. Boeres, J. V. Filho and V. E. F. Rebello, “A ClusterBased Strategy for Scheduling Task on Heterogeneous Processors,” Proceedings of the 16th Symposium on Computer Architecture and High Performance Computing (SBAC-PAD), Brazil, October 2004.
|
[7]
|
S. Basker and P. C. SaiRanga, “Scheduling Directed A-Cyclic Task Graphs on Heterogeneous Network of Workstations to Minimize Schedule Length,” Proceedings of the ICPPW, Taiwan, October 2003.
|
[8]
|
R. Bajaj and D. P. Agrawal, “Improving Scheduling of Tasks in a Heterogeneous Environments,” IEEE Transactions on Parallel and Distributed Systems, Vol. 15, No. 2, 2004, pp. 107-118. doi:10.1109/TPDS.2004.1264795
|
[9]
|
L. Wang, H. J. Siegel, V. P. Rowchoudhry and A. A. Maciejewski, “Task Matching and Scheduling in Heterogeneous Computing Environments Using a Genetic Algorithm-Based Approach,” Journal of Parallel and Distributed Computing, Vol. 47, No. 1, 1997, pp. 8-22.
doi:10.1006/jpdc.1997.1392
|
[10]
|
M. K. Dhodhi, I. Ahmad and A. Yatama, “An Integrated Technique for Task Matching and Scheduling onto Distributed Heterogeneous Computing Systems,” Journal of Parallel and Distributed Computing, Vol. 62, No. 9, 2002, pp. 1338-1361. doi:10.1006/jpdc.2002.1850
|
[11]
|
S. C. Kim and S. Lee, “Push-Pull: Guided Search DAG Scheduling for Heterogeneous Clusters,” Proceedings of the International Conference on Parallel Processing, Oslo, June 2005.
|
[12]
|
S. W. Annie, H. Yu, S. Jin and K.-C. Lin, “An Incremental Genetic Algorithm Approach to Multiprocessor Scheduling,” IEEE Transactions on Parallel and Distributed Systems, Vol. 15, No. 9, 2004, pp. 824-834.
doi:10.1109/TPDS.2004.38
|