Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

HTML  XML Download Download as PDF (Size: 558KB)  PP. 44-48  
DOI: 10.4236/ojg.2013.32007    5,958 Downloads   9,139 Views  Citations

ABSTRACT

In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, pipe jacking, and shield methods. In recent years, a new pipe jacking method has been established that can be adapted to 20 m below the ground or more. Using this method, the drivage machine and the jacking pipe continue to move an underground until the completion of the driving. Therefore an over-cutting area (so-called tail-void) must be formed to lower the friction between the ground and the pipe. The tail-void is filled with lubrications. However, because the stress release from the ground continues to advance when the tail-void is formed, hence there are some challenges required to cope with the stability of the surrounding ground. In order to utilize the pipe jacking method in the deeper strata layers, the theory, analysis and installation of tail-void have to be systemized, and such systematic data must be stored. Therefore, the conditions of tail-void in the deep pipe jacking method are discussed using numerical analyses.

Share and Cite:

T. Senda, H. Shimada, T. Sasaoka and K. Matsui, "Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata," Open Journal of Geology, Vol. 3 No. 2, 2013, pp. 44-48. doi: 10.4236/ojg.2013.32007.

Cited by

[1] Assessment of experimental friction parameters and contact property of pipe string for the estimation and verification of a solution for pipe stuck in the China's first rock …
2021
[2] Experimental Study on the Complex Contact Frictional Property of an Ultralong Distance Large-Section Concrete Pipe Jacking and Prediction of Pipe String …
2019
[3] Numerical simulation for an estimation of the jacking force of ultra-long-distance pipe jacking with frictional property testing at the rock mass–pipe interface
2019
[4] Experimental Study on the Complex Contact Frictional Property of an Ultralong Distance Large-Section Concrete Pipe Jacking and Prediction of Pipe String Stuck
2019
[5] A Full-Scale Experimental Study on the Performance of Jacking Prestressed Concrete Cylinder Pipe with Misalignment Angle
Proceedings of GeoShanghai 2018 International Conference: Multi-physics Processes in Soil Mechanics and Advances in Geotechnical Testing, 2018
[6] Research and Construction Control Points of Vertical Jacking Technology of Water Diversion Tunnel
2018
[7] Construction of a large-section long pedestrian underpass using pipe jacking in muddy silty clay: A case study
Tunnelling and Underground Space Technology, 2016
[8] Finite elements analysis of an underground collector installed by pipe-jacking method
Electric Power Components and Systems, 2016
[9] Research and construction control points of vertical jacking technology for water diversion tunnel
qiang - China Water & Wastewater, 2016
[10] 背填滑材對管推進中土壤與管材互制行為之影響
臺灣中興大學學位論文, 2014

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.