Prof. Singa Wang Chiu
Chaoyang University of Technology, Chinese Taipei
Professor
Email: swang@cyut.edu.tw
Qualifications
2004 Ph.D., Industrial Engineering & Management, Chung-Yuan Christian University, Chinese Taipei
1988 M.Sc., Computer and Information Science, New Jersey Institute of Technology, USA
1978 B.Sc., Banking and Insurance, Ming-Chuan University, Chinese Taipei
Publications (Selected)
-
Chiu, Singa Wang, Gong, D-C., Chiu, C-L., Chung, C-L. (2011) Joint determination of the production lot size and number of shipments for EPQ model with rework. Mathematical and Computational Applications 16(2) 317-328.
-
Chiu, Singa Wang, Yang, J-C., Wu, M-F. (2011) An alternative approach for determining production lot size with repairable items and cost reduction delivery policy. African Journal of Business Management 5(4) 1374-1377.
-
Chiu, Singa Wang (2010) Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Computers & Operations Research 37(5) 899-908.
-
Chiu, Singa Wang, Cheng, C-B., Wu, M-F., Yang, J-C. (2010) An Algebraic Approach for Determining the Optimal Lot Size for EPQ Model with Rework Process. Mathematical and Computational Applications 15(3) 364-370.
-
Chiu, Singa Wang, Chen, K-K., and Yang, J-C. (2009) Optimal replenishment policy for manufacturing systems with failure in rework, backlogging, and random breakdown. Mathematical and Computer Modelling of Dynamical Systems 15(3) 255-274.
-
Chiu, Singa Wang, Chiu, Y-S.P., Chuang, H-J., Lee, C-H., (2009) Incorporating machine reliability issue and backlogging into the EMQ model - Part II: Random breakdown occurring in inventory piling time. International Journal for Engineering Modelling, Vol. 22, Issues 1-4, pp. 15-24.
-
Chiu, Singa Wang, Lin, H-D., C-B.Cheng, Chung, C-L. (2009) Optimal production- shipment decisions for the finite production rate model with scrap. International Journal for Engineering Modelling, Vol. 22, Issues 1-4, pp. 25-34.
-
Chiu, Singa Wang, Lin, H-D, Chung, C-L., Lee, C-H. (2009) “Production lot sizing with the reworking of random defective items and fixed quantity multiple deliveries”. The 10thInternational Conference on Automation Technology (Automation 2009) June 27-29, 2009. National Cheng Kung University, Tainan, Taiwan.
-
Chiu, Singa Wang (2008) An optimization problem of manufacturing systems with stochastic machine breakdown and rework process. Applied Stochastic Models in Business and Industry 24(3) 203-219.
-
Chiu, Singa Wang, Chen, K-K., and Chang, H-H. (2008) Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair. Mathematical and Computational Applications 13(3) 137-145.
-
Chiu, Singa Wang, Wang, S.L., and Chiu, Y.P. (2007) Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research 180(2) 664-676.
-
Chiu, Singa Wang (2007) Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry 23(2) 165-178.
-
Chiu, Singa Wang, Ting, C-K., Chiu, Y.P. (2007) Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling 46(3-4) 535-549.
-
Chiu, Singa Wang (2007) Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model. P I Mech Eng Part B: Journal of Engineering Manufacture 221(7) 1235-1243.
-
Chiu, Singa Wang (2007) Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific & Industrial Research 66(12) 979-988.
-
Chiu, Singa Wang, C-C. Shih, and Chiu, Y.P. (2007) A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram. P IMech E Part B: Journal of Engineering Manufacture 221(3) 489-497.
Profile Details
NULL