World Journal of Engineering and Technology

Vol.5 No.4BB(2017), Paper ID 79533, 9 pages

DOI:10.4236/wjet.2017.54B002

 

The Feasibility Research on Distribution Network Closed Loop Based on the Load Transfer Model

 

Qi Yin, Rui Ding, Yongchun Zhao, Yanfen Liu, Xiaolin Liu

 

State Grid Deyang Electric Power Supply Company, Deyang, China
State Grid Deyang Electric Power Supply Company, Deyang, China
Beijing Join Bright Digital Power Technology Co., Ltd., Beijing, China
Beijing Join Bright Digital Power Technology Co., Ltd., Beijing, China
State Grid (Beijing) Energy Conservation Design and Research Institute Co. Ltd., Beijing, China

 

Copyright © 2017 Qi Yin, Rui Ding, Yongchun Zhao, Yanfen Liu, Xiaolin Liu et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

 

How to Cite this Article


Yin, Q. , Ding, R. , Zhao, Y. , Liu, Y. and Liu, X. (2017) The Feasibility Research on Distribution Network Closed Loop Based on the Load Transfer Model. World Journal of Engineering and Technology, 5, 12-20. doi: 10.4236/wjet.2017.54B002.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.