RETRACTED: Compare Methods of Fix Lead, Milawa NPV and Milawa Balance Algorithm in Optimizing the Production of Open Pit Mines with Whittel Software ()
Abstract
Short
Retraction Notice
This article has been retracted to
straighten the academic record. In making this decision the Editorial Board
follows COPE's Retraction Guidelines. The aim is
to promote the circulation of scientific research by offering an ideal research
publication platform with due consideration of internationally accepted
standards on publication ethics. The Editorial Board would like to extend its
sincere apologies for any inconvenience this retraction may have caused.
The full
retraction notice in PDF is
preceding the original paper, which is marked "RETRACTED".
Conflicts of Interest
The authors declare no conflicts of interest.
References
[1]
|
Vallee, M. (2000) Mineral Resource + Engineering, Economic and Legal Feasibility = Ore Reserve. CIM Bulletin, 90, 53-61.
|
[2]
|
Froyland, G., Menabde, M., Stone, P. and Hodson, D. (2004) The Value of Additional Drilling to Open Pit Mining Projects. In Orebody Modelling and Strategic Mine Planning—Uncertainty and Risk Management. The Australian Institute of Mining and Metallurgy, Perth, 169-176.
|
[3]
|
Whittle, J. (1989) The Facts and Fallacies of Open Pit Optimization. Whittle Programming Pty., Ltd., Victoria.
|
[4]
|
Lerchs, H. and Grossman, F. (1965) Optimum Design of Open-Pit Mines. Transaction CIM, 58, 47-54.
|
[5]
|
Wilke, F.L. and Reimer, T.H. (1979) Optimizing the Short-Term Production Schedule for an Open-Pit Iron Ore Mining System. Computer Methods for the 80’s in the Mineral Industry, Society of Mining Engineers of AIME, 12, 642-646.
|
[6]
|
Johnson, T.B. (1969) Optimum Production Scheduling. Proceedings, 8th International Symposium on Computers and Operations research, Salt Lake City, 24 January 1969, 539-562.
|
[7]
|
Williams, C.E. (1974) Computerized Year-by-Year Open Pit Mine Scheduling. Society of Mining Engineers, AIME, Transactions, 256, 45-52.
|