Integrating the SRM and Lean Paradigms: The Constructs and Measurements

Abstract

Through integrating the supplier relationship management (SRM) and lean paradigms, this paper develops the concept of lean supplier relationship management (LSRM) and examines its relationship with firm performance (FP). The LSRM practices are identified and mapped into: supply flexibility, just-in-time delivery, information integration, and supplier partnership. The developed hypotheses are tested using a sample of 162 Jordanian manufacturing firms. Results show that LSRM practices are positively and significantly correlated with each other, and they have a positive and significant relationship with FP. This study contributes to literature by synthesizing SRM and lean constructs, and providing empirical evidence of the relationship between LSRM and FP. The study also contributes to literature through developing an assessment tool for determining the level of adoption of the LSRM practices. Moreover, the study provides a sense of where Jordanian manufacturing firms are today on their journey in the field of LSRM, and provides practical implications for manufacturing firms involved in SRM initiatives.

Share and Cite:

Bwaliez, O. and Abushaikha, I. (2019) Integrating the SRM and Lean Paradigms: The Constructs and Measurements. Theoretical Economics Letters, 9, 2371-2396. doi: 10.4236/tel.2019.97151.

1. Introduction

Firms have long strived to improve performance through supply chain management (SCM). Suppliers are increasingly becoming valuable resources for firms due to their large and direct impact on firm performance (FP) in terms of good quality, efficiency, responsiveness, and customer satisfaction [1] [2] . Supplier relationship management (SRM) is one of the main paradigms that is extensively discussed in SCM research area [3] [4] [5] . SRM can be defined as the collaboration between the firm and its suppliers to maintain the flow of needed materials, resources, parts, and information [6] [7] .

Lean is a valuable paradigm that is applied by firms to survive [8] [9] [10] . The core principle of implementing lean is reducing waste through optimal utilization of firm’s resources [11] . SRM is one of the areas in which lean can be applied [12] [13] [14] . However, literature still lacks understanding of how lean can be applied in the context of SRM. This paper develops the concept of lean supplier relationship management (LSRM) and examines its relationship with FP. We propose that if a firm wants to adopt LSRM paradigm, it should collaboratively work with its suppliers to reduce cost and waste by pulling what is needed. This study develops an assessment tool to determine the level of adoption of the LSRM practices in Jordanian manufacturing firms, and provides a sense of where Jordanian manufacturing firms are today on their journey in the field of LSRM.

Jordanian firms have long been struggling in managing their supply chains due to several reasons. Firms in Jordan are liable to several risks leading to the disruption of the availability of materials and components and the wasting of significant resources [4] . This situation is because that Jordan has been affected negatively by the political instability in the Middle East, and closure of borders. Additionally, Jordan depends largely on import of merchandise from abroad due to the lack of manufacturing capabilities but also its limited natural resources. This means that there is higher complexity in the supply chain, and higher dependency is placed on achieving competitiveness through smoothing the flow of material and information [15] . Such a situation may affect the performance of Jordanian firms due to dissatisfied customers.

Therefore, understanding the effect of LSRM practices on each other and its influence on firms’ performance represents potential solutions to the aforementioned problems facing Jordanian manufacturing firms. Moreover, due to insufficiency and scarcity of knowledge, a thorough research is highly crucial and insistent in such area. The current study is one of the first studies that attempt to address this gap in the existing literature by addressing the following objectives: 1) integrating the SRM and lean paradigms and developing an assessment tool for measuring LSRM practices, and 2) examining the relationship between LSRM practices and FP. Taken together, this research utilizes the principles of SRM and the policies of lean to constitute a lean-based SRM construct for manufacturing firms in Jordan. This work will substantially enrich literature of SCM. The approach presented in this study can be used in order to improve the performance of manufacturing firms through adopting LSRM practices.

The remainder of this study is organized as follows: Section 2 presents a review of relevant literature, hypotheses development, and the research model. Section 3 presents the research methodology. Results and discussions are presented in Section 4. Conclusions are presented in Section 5. Finally, limitations and future research directions are presented in Section 6.

2. Literature Review

This section introduces the literature review on SRM and lean paradigms, and integrates the two paradigms into LSRM. This section also proposes the relevant hypotheses from literature and develops the theoretical model of the study.

2.1. SRM

SRM refers to the collaboration between the firm and its suppliers to maintain the flow of needed materials, resources, parts, and information for the purpose of producing goods or providing services efficiently and effectively [6] [7] . SRM plays a vital role in shaping the FP and involves managing all interactions with third party firms that supply goods or services to a firm in order to maximize the value of these interactions [1] [2] . In practice, SRM requires creating closer and more collaborative relationships with key suppliers in order to reveal and realize new value and reduce risk of failure [6] .

SRM involves a set of practices undertaken by a firm to boost effective SCM. According to [16] (p. 606), “the ultimate goal of supplier management practices is to achieve better performance in the supply chain”. [5] described the latest evolution of SRM practices, which include mainlining communication with major key suppliers, establishing long-term contracts, and pursuing joint investments with suppliers. While, [17] identified four aspects of SRM, namely sharing information, developing collaborative approaches, joint decision making, and system coupling with key suppliers. [18] used many activities to represent SRM practices. These activities are sharing information with suppliers through a coordinated information system, working with key suppliers in product and process innovation, working with them for developing new technologies, and involving them in the implementation of firm’s logistics network. Additionally, [19] viewed SRM in terms of supplier selection, supplier development, and supplier performance review. Moreover, [20] represented SRM through supplier base reduction, effective buyer-supplier relationship, communication, cross-functional teams, and supplier involvement. Consequently, the literature depicts SRM practices from a variety of different perspectives with a common goal of ultimately improving FP. After reviewing and consolidating the literature, four distinctive practices were developed. They are supplier selection, supplier involvement, communication, and buyer-supplier relationship. Table 1 lists these practices along with their definitions and supporting literature.

2.2. Lean and SRM

Lean is based on the idea of improving efficiency of the process by eliminating waste [11] . Any activity that uses resources but does not create any additional value is a waste should be removed [27] . [28] defined lean as a set of practices focused on cost reduction by elimination of non-value-added activities from the firm’s operations. In brief, lean can be defined as achieving more outputs with less inputs. Although lean concept came from manufacturing sector, it is now

Table 1. SRM practices with their definition and appearance in literature.

being applied widely in service sector [9] [29] [30] . Thus, lean can be applied in every business and every process. It is not only a tactic or a cost reduction program, but also a way of thinking and acting for an entire firm [11] [27] .

Regardless of establishing what lean is, it remains important to establish how to become lean. This can be achieved by a set of synergistic managerial practices called lean practices. These practices include but are not limited to SRM, continuous improvement, just-in-time (JIT), total quality management (TQM), work teams, employee involvement, and cellular manufacturing. Many scholarly works (e.g., [10] [11] [31] [32] [33] [34] ) offered a presentation of the most frequently identified lean practices in literature. Other works (e.g., [8] [10] [11] [28] [35] [36] ) supported the positive impact of these lean practices on FP. On the other hand, a considerable stream of literature (e.g., [9] [13] [30] ) has focused on synthesizing lean with other management practices.

This study synthesizes lean and SRM paradigms to constitute a lean-based SRM system for Jordanian manufacturing firms. LSRM is a systematic approach that integrates effective supplier relationship with lean practices to drive inefficiencies out of the firm. To apply LSRM paradigm, firms need to adopt a set of LSRM practices. LSRM practices can be defined as a set of SRM practices in a firm to boost its efficient SCM. They can also be defined as a set of supplier-related activities that are focusing on eliminating waste by reducing inventory and improving quality in the supply chain. Until now, a debate about determining the LSRM practices remains indecisive [11] , as there is no clear list of LSRM practices. Therefore, a wide literature on numerous publications has been reviewed in order to develop an exhaustive list of the main LSRM practices. Four practices were found among the most commonly used SRM practices in lean settings, namely supply flexibility (SF), JIT delivery (JD), information integration (II), and supplier partnership (SP). These practices with their descriptions and appearance in literature are listed in Table 2.

Table 2. The considered LSRM practices with their description and appearance in literature.

2.3. FP

FP is a set of managerial and critical methodologies that allow firm managers to attain one or more pre-selected goals [21] . Until now, there is neither consensus nor agreement among scholars and practitioners about the definition of FP and its elements [21] [30] [46] . Thus, there are several definitions and indicators used to measure it [6] [21] [30] [47] [48] .

2.4. Hypotheses Development

The relationships between the considered LSRM practices and their influence on FP are presented in the following subsections.

2.4.1. The Role of SF

SF of suppliers has a direct impact on the customer’s critical dimension of JD [40] . Delivery, in general, is one of the most often used SF criteria to select a good supplier [15] [21] . [38] and [49] argued that selecting the suitable supplier with good SF helps in developing SP between the firm and its suppliers through evaluating suppliers’ performance and their capability of providing innovations and co-designing products to meet customer needs. Suppliers having SF are considered valuable resources for manufacturers due to their large and direct effect on FP [1] [2] . [50] confirmed that selecting quality suppliers having SF capabilities improves FP. Moreover, SF is a key approach to improve FP by making sure suppliers are capable and committed to fulfilling manufacturer’s current and future expectations [38] . Selecting the right suppliers having SF not only brings radical benefits to firms but also improves customer satisfaction [51] . Hence, the following hypotheses are developed:

H1: SF practice has a positive relationship with JD practice.

H2: SF practice has a positive relationship with SP practice.

H3: SF practice has a positive relationship with FP.

2.4.2. The Role of JD

Meeting the requirements of delivery time is one of the important factors to be considered for SF [15] . Moreover, delivery is one of the most used criteria in evaluating and selecting the suitable logistics service providers [52] . In addition, [53] provided evidence that JD performance plays a critical role in the SF decision. According to [37] , it becomes a necessity to select a suitable supplier with JD to achieve SF. JD, on the other hand, facilitates good relationship between the firm and its suppliers [54] . JD also involves mutual and trusted long-term relationship with suppliers [55] . According to [56] , it is important to encourage suppliers and customers to develop JD in order to enhance SP. JD is crucial for all industries to gain global competitiveness [57] . JD also improves quality to achieve operational excellence [58] . According to [59] , JD has strong effect on logistics performance in supply chains. Consequently, the following hypotheses should be tested:

H4: JD practice has a positive relationship with SF practice.

H5: JD practice has a positive relationship with SP practice.

H6: JD practice has a positive relationship with FP.

2.4.3. The Role of II

II through sharing timely and sensitive information between firms and their suppliers improves SF [40] . Integrated inter-organizational communication brings closer relationship among the supply chain members in the field of II which promotes a comforting level of SP [60] . Employing II systems in supply chains might be an effective lean approach to enhance SP through managing information and communication on a real-time basis. II can lead to a faster and more efficient process to correct quality problems when they occur [43] . [61] argued that II systems help to achieve enhanced FP. [62] found that many supplier product problems were due to poor II. In addition, II between buyer and supplier is very crucial in SP through involvement in putting the fundamental design of product, its development process, and logistical decisions [6] [51] . II also provides the needed collaboration, which in turn leads to improved FP [63] . Moreover, II increases the competitive advantage of the supply chain [64] . Accordingly, the following hypotheses are proposed:

H7: II practice has a positive relationship with SF practice.

H8: II practice has a positive relationship with SP practice.

H9: II practice has a positive relationship with FP.

2.4.4. The Role of SP

Closeness of relationship between buyer and supplier is one of the criteria used to determine SF of the best alternative supplier [6] [65] . SP between a buying firm and its suppliers helps to upgrade supplier’s capabilities in delivery [66] . Cooperative SP between firms and their suppliers facilitate the achievement of JD [67] . According to [68] , SP helps to improve II through knowledge transfer from the buyer to the supplier. Likewise, a close SP among the supply chain members helps to share information [21] . As a result, SP can reinforce II [69] . [65] found that SP contributes to FP. It is widely accepted that effective SP enhances business competitiveness, profitability, and the ability of a firm to produce quality products [1] . Firms that embrace SP reported substantial revenue gains and cost savings. Moreover, a well-developed SP has an everlasting and positive effect on the competitiveness of the entire supply chain [70] . Thus, firms are increasingly looking forward to build close SP in order to achieve a stronger competitive position [6] . [49] found that a good SP leads to competitive advantage followed by profitability. Customer’s needs can be met by implementing a cooperative SP [21] . Moreover, higher profitability can also be achieved through SP [6] [15] [51] . [64] revealed that SP improves FP. Accordingly, the following hypotheses can be proposed:

H10: SP practice has a positive relationship with SF practice.

H11: SP practice has a positive relationship with JD practice.

H12: SP practice has a positive relationship with II practice.

H13: SP practice has a positive relationship with FP.

2.5. The Research Model

In order to explore the association between LSRM practices and FP, a proposed research model that combines all of the aforementioned hypotheses is developed. This model, shown in Figure 1, represents a structural equation model (SEM) that needs to be studied. LSRM practices and FP constitute the construct latent variables of this model.

The model proposes that LSRM practices have a positive relationship with FP. It also includes five main elements; the four LSRM practices, namely SF, JD, II, and SP (i.e., independent variables) and FP (i.e., dependent variable). Furthermore, there are a set of arrows that depict the interactions between these five elements. Note that arrows having two piles indicate that the relationship between the two construct latent variables is in two directions. Each arrow is also represented by its associated hypothesis presented in the previous section. In summary, the model investigates the relationships between LSRM practices themselves in one side and their impacts on FP from the other side. Besides that, this model differs in several ways from other models in literature. Unlike earlier studies that focused on examining the relationship between supply chain integration

Figure 1. The research model.

and FP (e.g., [6] [17] [26] [71] ), this study looks more closely at the SRM, which is part of supply chain integration. In examining FP, some researchers focus on either financial performance (e.g., [3] [72] ) or non-financial performance of the firm (e.g., [4] [17] [24] [71] ). This study takes both of them into account [73] . Consequently, this study presents the first research model that illustrates the effect of LSRM practices on each other and explains their effect on FP.

3. Methodology

This scholarly work is a cross-sectional study. It aims to study the effect of LSRM on FP of Jordanian manufacturing firms by collecting data through a questionnaire. The research instrument, population, and sample are presented in the next subsections.

3.1. Research Instrument

Based on the literature review, relevant questionnaire items were drafted in order to measure the construct latent variables of the research model. To improve the understanding of its content, the resulting draft was reviewed by five academic professors in the field of logistics and SCM at the German Jordanian University, and seven executive managers from different manufacturing firms. Then, some modifications were made according to their notes and recommendations. The items were ensured to be written in such a way that reduces the likelihood of misunderstanding the overall practice by the respondent. Thereafter, the finalized version of the questionnaire was valid to be used.

In its final form, the questionnaire comprised two main sections; the first section included questions about the firms’ type and size, while the second section of the questionnaire contained 50 follow-on accurate and specific items about the implementation level of each LSRM practice and FP. The respondents were asked to evaluate each item using five-point Likert scale anchored from 1 = not adopted to 5 = fully adopted, and centered at 3 = partially adopted. The next subsections present the construct latent variables of the model and how they were measured in the questionnaire with supporting references.

3.1.1. SF Construct

SF practice was measured through the criteria on which the supplier is selected. This criterion includes supplier’s price, product quality, production capability, flexibility, historical performance, delivery performance, closeness to the firm, reputation, financial position, and post-sales services [16] [38] [52] [74] [75] . Table 3 shows these measures.

3.1.2. JD Construct

Measurement items adopted by many scholarly works (e.g., [11] [21] [27] [41] [43] [53] [64] [74] [76] ) were used in this study to measure JD practice. These items assessed the extent to which the firm’s suppliers can deliver goods in small lot sizes, on high frequency, and small lead time basis as shown in Table 4.

Table 3. Questionnaire items of SF construct.

Table 4. Questionnaire items of JD construct.

3.1.3. II Construct

Many scholars (e.g., [38] [43] [64] [76] ) presented many examples of measurement items can be used to examine II, which include evaluating the extent of firm’s ability to provide its suppliers with information about production planning, inventory level, demand forecast, and regular feedback on their performance. These items are shown in Table 5.

3.1.4. SP Construct

Some examples of items that were used to measure SP includes long-term contracts, supplier’s reliability and integrity, and active steps taken by the firm to reduce the number of short-term suppliers. These items were adopted from [15] [23] [43] [51] [76] [77] [78] . Table 6 shows all of these items.

3.1.5. FP Construct

Due to its multidimensionality, academic scholars confronted many difficulties to build appropriate and measurable FP constructs [46] . Although, subjective and objective measures of FP are provided in literature [47] [48] , subjective measures are more preferable by business management researchers (e.g., [5] [21] [26] ). In line with these researchers, a set of subjective measures were used in this study. In literature, FP was assessed by the product quality, market share growth, customer satisfaction, employee satisfaction, firm reputation, and the competitive position of the firm compared to competitors [21] [22] [73] . Table 7 shows the items used to measure FP.

3.2. Research Population and Sample

The population of this research consisted of all manufacturing firms in Amman, the capital city of Jordan, that are listed in the Amman Chamber of Industry (ACI). According to [80] , there are 1200 manufacturing firms that are located in

Table 5. Questionnaire items of II construct.

Table 6. Questionnaire items of SP construct.

Table 7. Questionnaire items of FP construct.

Amman and they are classified into 10 industrial sectors, namely therapeutics, plastic and rubber products, chemicals, engineering and electrical industries, furniture, construction, printing and paper, food and supply, garments, and mining. As recommended by [81] , the sample size that is suitable for this population is 292. Our questionnaire was sent to 300 Jordanian manufacturers who were willing to participate in this study, after being contacted by email and phone. The selected sample was taken from all the typical industrial classifications distinguished by [80] to ensure a full representation of manufacturing sector in Jordan [9] . At the end, a total of 162 valid responses were received, making a response rate of 54%. This percentage goes in line with several other studies that were conducted within the area of lean management and used a similar distribution methodology (e.g. [9] [30] [82] ). Moreover, the authors of this study administrated and aggressively followed up the questionnaire distribution process themselves. Their involvement contributed to the delivery of the questionnaire to as many respondents as possible and helped in clarifying any ambiguity concerning the definitions or any other issues related to the questionnaire. The characteristics of the selected sample are shown in Table 8.

Managers in the top or middle levels who have a direct contact with suppliers and those with responsibilities related to SCM activities were asked to participate in the questionnaire. Hence, respondents included general managers, supply chain managers, operations managers, plant managers, purchasing managers, and others. It is worth mentioning that a pretest pilot study was conducted before distributing the questionnaire to the targeted firms in order to test the questionnaire items for their clarity, comprehensiveness, and acceptability. As suggested by [83] , a random sample of 25 firms was selected for this pilot study. Eighteen responses with a response rate of 72% were received. The received responses were carefully studied and analyzed, and the required adjustments were made.

4. Results and Discussions

Detailed statistical analyses were carried out using the statistical packages for the

Table 8. Sample composition (n = 162 firms).

social sciences (SPSS), namely IBM SPSS Statistics and IBM SPSS Amos. It comprised multicollinearity, validity and reliability, model fitness, descriptive analysis, hypotheses testing, and analysis of variance (ANOVA). These analyses are presented in the next subsections.

4.1. Multicollinearity

Multicollinearity of the dataset is measured by the coefficient of correlation. According to [84] , multicollinearity indicates the degree by which questionnaire items measure the same entity. The coefficient of correlation ranges from −1 to 1, and a value of 0.9 or above for the inter-item correlations indicates the possibility that two or more items measure the same entity. Zero correlation means that there is no relation between the items. Table 9 shows the correlation matrix for all construct latent variables of the research model. It is worth mentioning that the correlation analysis was conducted between the mean of answers for each construct latent variable. Since there is no value above the threshold of 0.9, it is confirmed that there are no multicollinearity type problems in our model.

4.2. Validity and Reliability

Validity of the research instrument can be confirmed by ensuring both content and face validity [79] . To ensure content validity of the research instrument, questionnaire items were drafted based on multiple sources of data (i.e., various scholarly works mentioned in the literature review). To ensure face validity, the resulting draft was reviewed by a panel of judges of academic professors and executive managers as mentioned earlier. Consequently, research instrument validity was assumed.

Table 9. Correlation matrix of the construct latent variables.

**Correlation is significant at the 0.01 level (two-tailed).

Reliability includes internal consistency of the construct latent variables [9] . It is measured using the Cronbach’s alpha (α) coefficient, which gives a reflection of the degree to which different items complement each other and measure the same overall concept [85] . The closer Cronbach’s α coefficient to 1.0, the greater internal consistency of the items in the questionnaire [85] [87] . Although values above 0.7 are often considered to be acceptable [86] [87] , a Cronbach’s α value of 0.8 is mainly the target [87] . A value of 0.6 or less indicates unsatisfactory consistency reliability [84] . Table 10 shows that Cronbach’s α values for all construct latent variables and the overall LSRM practices are more than 0.7. Consequently, research instrument reliability was also assumed.

4.3. Model Fitness

Model fitness refers to the degree to which the SEM matches the observed data. For the purpose of this study, we used Chi-square (χ2) test, relative chi-square ratio (χ2-ratio), root mean square error of approximation (RMSEA), comparative fit index (CFI), and t-test to measure the model fitness.

While, a high value of χ2 means that there is a poor fit between the observed and expected frequencies, a small value of χ2 indicates a good model fitness. Due to the effect of sample size, Chi-square test is not always a clear assessment tool of the model fitness. Thus, various kinds of fitness indices that are independent of the sample size have been developed. According to [88] , the χ2-ratio is computed through dividing the χ2 value by the corresponding degrees of freedom (DF). If the value of χ2-ratio is less than 5, the proposed model will be accepted [88] . Table 11 shows that the χ2-ratio for all hypotheses is less than 5, which means that the proposed model can be accepted.

RMSEA can also be used to measure the model fitness. RMSEA value of 0.05 or less means that there is a close fitness of the model in relation to the DF, and the models with RMSEA value of 0.10 or more have poor fitness [87] . Table 11 shows that all RMSEA values of the proposed model are less than 0.05. Thus, the results of RMSEA test support our model fitness.

The fitness index that is least affected by sample size comparing with other indices is CFI [89] . It ranges from zero for a poor fitness to 1.0 for a good fitness. However, a value of 0.9 is considered as an indicator for good fitness. This index

Table 10. Cronbach’s α value of the construct latent variables.

Table 11. Fitness of the developed SEM.

is derived from comparing the hypothesized model with the independent model, and it provides a measure of the complete co-variation [90] . Table 11 shows that all CFI values are very close to 0.9, which means that our proposed model has good fitness.

The t-test was used to measure the statistical significance of the relationship between SEM variables at a specific level of significance (α = 0.01). In this test, the t-value computed by a specific equation or using a statistical software (referred to as t0) is compared with the value of t indicated in the t-distribution table (referred to as tα,DF in one-tailed test and tα/2,DF in two-tailed test) [87] [91] . In our two-tailed test, if |t0| > tα/2,DF, this indicates that there is a significant relationship between the two variables [91] . Since the absolute value of all t-values presented in Table 11 exceeds the values indicated in the t-distribution table, all developed hypotheses are supported.

The estimated strength (i.e., standardized regression weights) of each relationship between all construct latent variables are presented in Table 11 and shown in Figure 2. Improving or harming any one of the four LSRM practices will affect each other, and will have an impact on FP according to the estimated strength of each relationship among them. This implies that none of them should be ignored or given less attention. It is clear that SF practice has the highest impact on FP with a regression weight of 0.89, followed by II practice with a regression weight of 0.83, then JD with a regression weight of 0.81, and SP practice has the lowest impact on FP with a regression weight of 0.64.

4.4. Descriptive Analysis

Table 12 shows a descriptive analysis comprises finding the mean ( x ¯ ), variance (S2), and implementation index for each construct latent variable. It also shows that the selected sample of Jordanian manufacturing firms implements the considered LSRM practices by 50.58%. The highest implementation level is in SF practice with a percentage of 65.11%, while the lowest implementation level is in JD practice with a percentage of 32.31%.

Figure 3 draws the relationship between the impacts of LSRM practices on FP using the estimated strength of the relationships listed in Table 11 versus the implementation index of these practices listed in Table 12. The horizontal dashed line represents the average of the implementation index values of the overall LSRM practices, which is 50.58%, and the vertical dashed line represents the average impact of these practices on FP, which is 0.79. These two dashed lines divide the diagram in terms of impact on FP (either high or low) and

Figure 2. Estimated strengths of the SEM relationships.

Figure 3. Impact of LSRM practices on FP versus their implementation index.

Table 12. Descriptive analysis of the construct latent variables.

implementation index (either high or low) into four quarters: high impact on FP—high implementation level, low impact on FP—high implementation level, low impact on FP—low implementation level, and high impact on FP—low implementation level.

From the classification shown in Figure 3, it can be concluded that the greatest opportunity for improving Jordanian firms’ performance should be focused on aspects related to JD and II practices due to their high impact on FP and low implementation level by Jordanian manufacturing firms. However, SF practice should not have high priority by Jordanian manufacturing firms because its implementation level is the highest among other practices (i.e., 65.11%). In addition, Due to the fact that Jordanian firms maintain good relationships and deep connections with their suppliers [15] , SP practice has the second highest implementation index (i.e., 63.27%) after SF practice. SP practice should have the lowest priority by Jordanian manufacturing firms because its estimated impact on FP is the lowest among other practices (i.e., 0.64).

4.5. Hypotheses Testing and ANOVA

Although t-test can be used for hypotheses testing, measuring the p-value for each relationship can also be used to test hypotheses. If p-value is less than α then there is a significant relationship between the studied variables [91] . At the 0.01 level of significance, Table 11 shows that p-value for each relationship is less than α. This leads to the same results of the t-test that support all of the developed hypotheses.

ANOVA is one of the popular techniques of hypotheses testing [87] . It is a method of decomposing the total variability in a set of observations, as measured by the sum of the squares of these observations from their average, into component sums of squares that are associated with specific defined sources of variation [91] . Table 13 shows a two-tailed one way ANOVA test of the developed model at the 0.01 level of significance. It is clear that f0-values exceed the value of f0.005,v1,v2 for each LSRM practice. This means that all LSRM practices have positive and significant relationships with FP.

The findings of the study at hand corroborate with previous studies on the positive and significant impact of the ordinary SRM practices on FP (e.g., [1] [3] [6] [18] [49] [64] ). The study findings are also consistent with previous studies that explored the role of adopting SRM practices in lean settings and contexts (e.g., [38] [53] ). Moreover, our findings go in line with the previous results of several national (e.g., [79] [92] ) and international studies (e.g., [8] [28] [35] [36] ) that revealed a positive and significant relationship between lean practices and FP. Taken together, the general assumption in literature is that either lean practices affect FP or SRM practices affect FP, without investigating the effect of both of them combined on FP. This study improves our understanding of how integrating both SRM and lean paradigms could be translated into improved FP. Consequently, the finding that LSRM practices have a positive and significant relationship with FP is an important contribution to the logistics and SCM literature.

Table 13. One-way ANOVA test of the developed SEM.

5. Conclusions

The necessity for efficient buyer-supplier relationship has made supplier analysis one of the firm’s most important processes. This study was motivated by a desire to explore the relationship between adopting LSRM practices and their effect on FP. It utilizes the principles of SRM and the policies of lean to constitute a lean-based SRM system. In LSRM, the focal firm collaboratively works with its suppliers to reduce cost and waste by pulling what is needed. Thus, LSRM can be achieved through a set of practices that are focusing on eliminating waste by reducing inventory and improving quality in the supply chain. Based on literature review, this study considered SF, JD, II, and SP as the main LSRM practices. In brief, the current study is one of the first studies to address the following two objectives: 1) integrating the SRM and lean paradigms and developing an assessment tool for measuring LSRM practices, and 2) examining the relationship between LSRM practices and FP.

The findings show that the selected sample of Jordanian manufacturing firms implements the considered LSRM practices by 50.58%. The highest implementation level is in SF practice, followed by SP, then II, and the lowest implementation level is in JD practice. Regarding the effects of practices on each other, the results provide strong evidence that the considered LSRM practices affect each other positively and significantly, and they have a positive and significant effect on the performance of Jordanian manufacturing firms. Improving or harming any one of the four LSRM practices will affect each other and will have an impact on FP according to the standardized regression weights among them. This implies that none of them should be ignored or given less attention. SF practice has the highest impact on FP, followed by II practice, then JD, and SP practice has the lowest impact on FP.

The greatest opportunity for improving Jordanian firms’ performance should be focused on aspects related to JD and II practices due to their high impact on FP and low implementation level. JD practice can be enhanced in Jordanian manufacturing firms through asking suppliers to deliver needed parts in small lot sizes on high frequency basis (i.e., small lead times). On the other hand, to improve II practice, Jordanian manufacturing firms should frequently and timely provide their suppliers with information about demand forecast, production planning decisions, and inventory level. They are also recommended to use information systems such as Extranet, electronic data interchange (EDI), and business to business (B2B) to ensure more information transfer and exchange. Moreover, Jordanian manufacturing firms should provide their suppliers with regular feedback about their performance and training and development programs for continuous improvement. Suppliers should also be directly involved in new product development processes.

Findings of this study can act as a managerial guide for LSRM implementation in Jordanian manufacturing firms as well as a reference for future studies in this field. Such study is necessary for Jordanian firms in order to improve their performance, efficiency, and productivity. Firms, regardless of their business type, have to consider lean in their daily operations because it can improve their overall performance.

6. Limitations and Directions for Future Research

Though this study attained some important findings and insights related to integrating SRM and lean paradigms, it has limitations that can be addressed in future studies. Our data were obtained from a sample of 162 Jordanian manufacturing firms representing 10 industrial sectors. However, the restriction of the data collection to a single country limits the generalization of the results. In order to generalize the results, this study can be applied in additional countries other than Jordan; it also can be done with larger samples. The assessment tool developed in this study can also be used by future researchers interested in the area of LSRM who could conclude corroborating or conflicting results.

This study is restricted only in one impact area of lean, which is SRM area. In order to build upon this study, future researchers are recommended to measure the implementation level of the other lean impact areas, such as warehouse management, transportation management, new product development, human resource management, and customer relationship management.

Conflicts of Interest

The authors declare no conflicts of interest regarding the publication of this paper.

References

[1] Ndubisi, N.O., Jantan, M., Hing, L.C. and Ayub, M.S. (2005) Supplier Selection and Management Strategies and Manufacturing Flexibility. The Journal of Enterprise Information Management, 18, 330-349.
https://doi.org/10.1108/17410390510592003
[2] Foerstl, K., Franke, H. and Zimmermann, F. (2016) Mediation Effects in the ‘Purchasing and Supply Management (PSM) Practice-Performance Link’: Findings from a Meta-Analytical Structural Equation Model. Journal of Purchasing & Supply Management, 22, 351-366.
https://doi.org/10.1016/j.pursup.2016.08.001
[3] Lambert, D.M. and Schwieterman, M.A. (2012) Supplier Relationship Management as a Macro Business Process. Supply Chain Management: An International Journal, 17, 337-352.
https://doi.org/10.1108/13598541211227153
[4] Abdallah, A.B., Abdullah, M.I. and Saleh, F.I.M. (2017) The Effect of Trust with Suppliers on Hospital Supply Chain Performance: The Mediating Role of Supplier Integration. Benchmarking: An International Journal, 24, 694-715.
https://doi.org/10.1108/BIJ-05-2016-0062
[5] Amoako-Gyampah, K., Boakye, K.G., Adaku, E. and Famiyeh, S. (2019) Supplier Relationship Management and Firm Performance in Developing Economies: A Moderated Mediation Analysis of Flexibility Capability and Ownership Structure. International Journal of Production Economics, 208, 160-170.
https://doi.org/10.1016/j.ijpe.2018.11.021
[6] Flynn, B., Huo, B. and Zhao, X. (2010) The Impact of Supply Chain Integration on Performance: A Contingency and Configuration Approach. Journal of Operations Management, 28, 58-71.
https://doi.org/10.1016/j.jom.2009.06.001
[7] Huang, M.C., Yen, G.F. and Liu, T.C. (2014) Reexamining Supply Chain Integration and the Supplier’s Performance Relationships under Uncertainty. Supply Chain Management: An International Journal, 19, 64-78.
https://doi.org/10.1108/SCM-04-2013-0114
[8] Nawanir, G., Kong Teong, L. and Othman, S.N. (2013) Impact of Lean Practices on Operations Performance and Business Performance: Some Evidence from Indonesian Manufacturing Companies. Journal of Manufacturing Technology Management, 24, 1019-1050.
https://doi.org/10.1108/JMTM-03-2012-0027
[9] Al-Tahat, M.D. and Bwaliez, O.M. (2015) Lean-Based Workforce Management in Jordanian Manufacturing Firms. International Journal of Lean Enterprise Research, 1, 284-316.
https://doi.org/10.1504/IJLER.2015.071744
[10] Wickramasinghe, G.L.D. and Wickramasinghe, V. (2017) Implementation of Lean Production Practices and Manufacturing Performance: The Role of Lean Duration. Journal of Manufacturing Technology Management, 28, 531-550.
https://doi.org/10.1108/JMTM-08-2016-0112
[11] Dave, Y. and Sohani, N. (2019) Improving Productivity Through Lean Practices in Central India-Based Manufacturing Industries. International Journal of Lean Six Sigma, 10, 601-621.
https://doi.org/10.1108/IJLSS-10-2017-0115
[12] Doolen, T.L. and Hacker, M.E. (2005) A Review of Lean Assessment in Organizations: An Exploratory Study of Lean Practices by Electronics Manufacturers. Journal of Manufacturing Systems, 24, 55-67.
https://doi.org/10.1016/S0278-6125(05)80007-X
[13] Kim, S.K. (2015) Lean Initiative Practice for Supplier Developments in Philippines. International Journal of Lean Six Sigma, 6, 349-368.
https://doi.org/10.1108/IJLSS-12-2014-0042
[14] Frazzon, E., Tortorella, G.L., Dávalos, R., Holtz, T. and Coelho, L. (2017) Simulation-Based Analysis of a Supplier-Manufacturer Relationship in Lean Supply Chains. International Journal of Lean Six Sigma, 8, 262-274.
https://doi.org/10.1108/IJLSS-03-2016-0009
[15] Abushaikha, I., Al-Weshah, G. and Alsharairi, M. (2019) How Do Retail Firms Benefit from Co-Locating in Logistics-Intensive Clusters? A Focus on the Inbound Supply Function. The International Review of Retail, Distribution, and Consumer Research, 1-19.
https://doi.org/10.1080/09593969.2019.1635906
[16] Qrunfleh, S. Tarafdar, M. and Ragu-Nathan, T.S. (2012) Examining Alignment between Supplier Management Practices and Information Systems Strategy. Benchmarking: An International Journal, 19, 604-617.
https://doi.org/10.1108/14635771211258034
[17] Boer, H. and Boer, H. (2019) Design-for-Variety and Operational Performance: The Mediating Role of Internal, Supplier, and Customer Integration. Journal of Manufacturing Technology Management, 30, 438-461.
https://doi.org/10.1108/JMTM-03-2018-0065
[18] Duhaylongsod, J.B. and De Giovanni, P. (2019) The Impact of Innovation Strategies on the Relationship Between Supplier Integration and Operational Performance. International Journal of Physical Distribution & Logistics Management, 49, 156-177.
https://doi.org/10.1108/IJPDLM-09-2017-0269
[19] Kumar, D. and Rahman, Z. (2016) Buyer Supplier Relationship and Supply Chain Sustainability: Empirical Study of Indian Automobile Industry. Journal of Cleaner Production, 131, 836-848.
https://doi.org/10.1016/j.jclepro.2016.04.007
[20] Chen, I.J. and Paulraj, A. (2004) Towards a Theory of Supply Chain Management: The Constructs and Measurements. Journal of Operations Management, 22, 119-150.
https://doi.org/10.1016/j.jom.2003.12.007
[21] Sezhiyan, D.M. and Nambirajan, T. (2010) Development of Scale to Measure Supplier Selection, Supply Effort Management and Organizational Performance. Asia-Pacific Business Review, 6, 12-17.
https://doi.org/10.1177/097324701000600404
[22] Forkmann, S., Henneberg, S.C., Naudé, P. and Mitrega, M. (2016) Supplier Relationship Management Capability: A Qualification and Extension. Industrial Marketing Management, 57, 185-200.
https://doi.org/10.1016/j.indmarman.2016.02.003
[23] Jajja, M.S.S., Kannan, V.R., Brah, S.A. and Hassan, S.Z. (2017) Linkages between Firm Innovation Strategy, Suppliers, Product Innovation, and Business Performance: Insights from Resource Dependence Theory. International Journal of Operations & Production Management, 37, 1054-1075.
https://doi.org/10.1108/IJOPM-09-2014-0424
[24] Al-Abdallah, G.M., Abdallah, A.B. and Bany Hamdan, K. (2014) The Impact of Supplier Relationship Management on Competitive Performance of Manufacturing Firms. International Journal of Business and Management, 9, 192-202.
https://doi.org/10.5539/ijbm.v9n2p192
[25] Li, S., Ragu-Nathan, B., Ragu-Nathan, T.S. and Subba Rao, S. (2006) The Impact of Supply Chain Management Practices on Competitive Advantage and Organizational Performance. Omega, 34, 107-124.
https://doi.org/10.1016/j.omega.2004.08.002
[26] Liu, H., Ke, W., Kee Wei, K. and Hua, Z. (2013) Effects of Supply Chain Integration and Market Orientation on Firm Performance: Evidence from China. International Journal of Operations & Production Management, 33, 322-346.
https://doi.org/10.1108/01443571311300809
[27] Womack, J., Jones, D. and Roos, D. (1990) The Machine that Changed the World: The Story of Lean Production. Harper Perennial, New York, NY.
[28] Yang, M.G., Hong, P. and Modi, S.B. (2011) Impact of Lean Manufacturing and Environmental Management on Business Performance: An Empirical Study of Manufacturing Firms. International Journal of Production Economics, 129, 251-261.
https://doi.org/10.1016/j.ijpe.2010.10.017
[29] Adebanjo, D., Laosirihongthong, T. and Samaranayake, P. (2016) Prioritizing Lean Supply Chain Management Initiatives in Healthcare Service Operations: A Fuzzy AHP Approach. Production Planning & Control, 27, 953-966.
https://doi.org/10.1109/IEEM.2013.6962410
[30] Abushaikha, I., Salhieh, L. and Towers, N. (2018) Improving Distribution and Business Performance through Lean Warehousing. International Journal of Retail & Distribution Management, 46, 780-800.
https://doi.org/10.1108/IJRDM-03-2018-0059
[31] Shah, R. and Ward, P.T. (2007) Defining and Developing Measures of Lean Production. Journal of Operations Management, 25, 785-805.
https://doi.org/10.1016/j.jom.2007.01.019
[32] Browning, T.R. and Heath, R.D. (2009) Reconceptualizing the Effects of Lean on Production Costs with Evidence from the F-22 Program. Journal of Operations Management, 27, 23-44.
https://doi.org/10.1016/j.jom.2008.03.009
[33] Belekoukias, I., Garza-Reyes, J.A. and Kumar, V. (2014) The Impact of Lean Methods and Tools on the Operational Performance of Manufacturing Organizations. International Journal of Production Research, 52, 5346-5366.
https://doi.org/10.1080/00207543.2014.903348
[34] Sahoo, S. and Yadav, S. (2018) Lean Production Practices and Bundles: A Comparative Analysis. International Journal of Lean Six Sigma, 9, 374-398.
https://doi.org/10.1108/IJLSS-01-2017-0002
[35] Taj, S. and Morosan, C. (2011) The Impact of Lean Operations on the Chinese Manufacturing Performance. Journal of Manufacturing Technology Management, 22, 223-240.
https://doi.org/10.1108/17410381111102234
[36] Sangwa, N.R. and Sangwan, K.S. (2018) Development of an Integrated Performance Measurement Framework for Lean Organizations. Journal of Manufacturing Technology Management, 29, 41-48.
https://doi.org/10.1108/JMTM-06-2017-0098
[37] Barla, S.B. (2003) A Case Study of Supplier Selection for Lean Supply by Using a Mathematical Model. Logistics Information Management, 16, 451-459.
https://doi.org/10.1108/09576050310503420
[38] So, S. and Sun, H. (2010) Supplier Integration Strategy for Lean Manufacturing Adoption in Electronic-Enabled Supply Chains. Supply Chain Management: An International Journal, 15, 474-487.
https://doi.org/10.1108/13598541011080455
[39] El Mokadem, M. (2017) The Classification of Supplier Selection Criteria with Respect to Lean or Agile Manufacturing Strategies. Journal of Manufacturing Technology Management, 28, 232-249.
https://doi.org/10.1108/JMTM-04-2016-0050
[40] Simpson, D.F. and Power, D.J. (2005) Use the Supply Relationship to Develop Lean and Green Suppliers. Supply Chain Management: An International Journal, 10, 60-68.
https://doi.org/10.1108/13598540510578388
[41] Kisperska-Moron, D. and De Haan, J. (2011) Improving Supply Chain Performance to Satisfy Final Customers: ‘Leagile’ Experiences of a Polish Distributor. International Journal of Production Economics, 133, 127-134.
https://doi.org/10.1016/j.ijpe.2009.12.013
[42] Moyano-Fuentes, J. and Sacristán-Díaz, M. (2012) Learning on Lean: A Review of Thinking and Research. International Journal of Operations & Production Management, 32, 551-582.
https://doi.org/10.1108/01443571211226498
[43] Marodin, G.A., Tortorella, G.L., Frank, A.G. and Filho, M.G. (2017) The Moderating Effect of Lean Supply Chain Management on the Impact of Lean Shop Floor Practices on Quality and Inventory. Supply Chain Management: An International Journal, 22, 473-485.
https://doi.org/10.1108/SCM-10-2016-0350
[44] Martínez-Jurado, P.J. and Moyano-Fuentes, J. (2014) Lean Management, Supply Chain Management and Sustainability: A Literature Review. Journal of Cleaner Production, 85, 134-150.
https://doi.org/10.1016/j.jclepro.2013.09.042
[45] Jasti, N. and Kodali, R. (2015) A Critical Review of Lean Supply Chain Management Frameworks: Proposed Framework. Production & Planning Control, 26, 1051-1068.
https://doi.org/10.1080/09537287.2015.1004563
[46] Miller, C.C., Washburn, N.T. and Glick, W.H. (2013) Perspective—The Myth of Firm Performance. Organization Science, 24, 948-964.
https://doi.org/10.1287/orsc.1120.0762
[47] Richard, P.J., Devinney, T.M., Yip, G.S. and Johnson, G. (2009) Measuring Organizational Performance: Towards Methodological Best Practice. Journal of Management, 35, 718-804.
https://doi.org/10.1177/0149206308330560
[48] Silvestro, R. (2014) Performance Topology Mapping: Understanding the Drivers of Performance. International Journal of Production Economics, 156, 269-282.
https://doi.org/10.1016/j.ijpe.2014.05.011
[49] Joshi, S., Kharat, M., Raut, R., Kamble, S. and Kamble, S. (2017) To Examine the Relationships between Supplier Development Practices and Supplier-Buyer Relationship Practices from the Supplier’s Perspective. Benchmarking: An International Journal, 24, 1309-1336.
https://doi.org/10.1108/BIJ-01-2016-0006
[50] Shin, H., Collier, D.A. and Wilson, D. (2000) Supply Management Orientation and Supplier/Buyer Performance. Journal of Operations Management, 18, 317-333.
https://doi.org/10.1016/S0272-6963(99)00031-5
[51] Samawi, G., Abushaikha, I., Salhieh, L., Mdanat, M. and Al-Rashid, A. (2019) Aligning Business Strategic Priorities and Purchasing Practices in Industrial Firms: Evidence from an Emerging Economy. Theoretical Economic Letters, 9, 709-736.
https://doi.org/10.4236/tel.2019.94047
[52] Alkhatib, S.F. (2017) Strategic Logistics Outsourcing: Upstream-Downstream Supply Chain Comparison. Journal of Global Operations and Strategic Sourcing, 10, 309-333.
https://doi.org/10.1108/JGOSS-08-2016-0024
[53] Wu, Y.C. (2003) Lean Manufacturing: A Perspective of Lean Suppliers. International Journal of Operations & Production Management, 23, 1349-1376.
https://doi.org/10.1108/01443570310501880
[54] Kinyua, B.K. (2015) An Assessment of Just in Time Procurement System on Organization Performance: A Case Study of Corn Products Kenya Limited. European Journal of Business and Social Sciences, 4, 40-53.
[55] Singh, D.K. and Singh, S. (2015) Procurement Strategy for Manufacturing and JIT. International Journal of Engineering Research and Development, 11, 10-17.
[56] Helper, S. (1991) How Much Has Really Changed between US Automakers and Their Suppliers? Sloan Management Review, 15, 15-28.
[57] Singh, S. and Garg, D. (2011) Attributes in JIT Purchasing. AKGEC Journal of Technology, 2, 29-33.
[58] Kulkarni, S.N., Patil. A.M. and Pingle, S.S. (2014) Supplier Evaluation and Purchasing in JIT Environment—A Survey of Indian Firms. International Journal of Mechanical and Production Engineering, 2, 1-5.
[59] Othman, A.A., Sundram, V.P.K., N.M. and Bahrin, A.S. (2016) The Relationship between Supply Chain Integration, Just-in-Time and Logistics Performance: A Supplier’s Perspective on the Automotive Industry in Malaysia. International Journal of Supply Chain Management, 5, 44-51.
[60] Guimaraes, T., Cook, D. and Natarajan, N. (2002) Exploring the Importance of Business Clockspeed as a Moderator for Determinants of Supplier Network Performance. Decision Sciences, 33, 629-644.
https://doi.org/10.1111/j.1540-5915.2002.tb01659.x
[61] Rai, A., Patnayakuni, R. and Seth, N. (2006) Firm Performance Impacts of Digitally Enabled Supply Chain Integration Capabilities. MIS Quarterly, 30, 225-246.
https://doi.org/10.2307/25148729
[62] Newman, R.G. and Rhee, K.A. (1990) A Case Study of NUMMI and its Suppliers. Journal of Purchasing and Materials Management, 26, 15-20.
https://doi.org/10.1111/j.1745-493X.1990.tb00516.x
[63] Lin, C., Chow, W., Madu, C.N., Kuei, C. and Yu, P. (2005) A Structural Equation Model of Supply Chain Quality Management and Organizational Performance. International Journal of Production Economics, 96, 355-365.
https://doi.org/10.1016/j.ijpe.2004.05.009
[64] de Araújo, M.C.B., Alencar, L.H. and Viana, J.C. (2015) Structuring a Model for Supplier Selection. Management Research Review, 38, 1213-1232.
https://doi.org/10.1108/MRR-04-2014-0076
[65] Prajogo, D., Oke, A. and Olhager, J. (2016) Supply Chain Processes: Linking Supply Logistics Integration, Supply Performance, Lean Processes and Competitive Performance. International Journal of Operations & Production Management, 36, 220-238.
https://doi.org/10.1108/IJOPM-03-2014-0129
[66] Handfield, R.B. and Bechtel, C. (2002) The Role of Trust and Relationship Structure in Improving Supply Chain Responsiveness. Industrial Marketing Management, 31, 367-382.
https://doi.org/10.1016/S0019-8501(01)00169-9
[67] Zeller, T.L. (1995) Achieving Market Excellence through Quality: The Case of Ford Motor. Business Horizons, 38, 23-31.
https://doi.org/10.1016/0007-6813(95)90019-5
[68] Wagner, S.M. and Krause, D.R. (2009) Supplier Development: Communication Approaches, Activities and Goals. International Journal of Production Research, 47, 3161-3177.
https://doi.org/10.1080/00207540701740074
[69] Aharonovitz, M.C.S., Vidal Vieira, J.G. and Suyama, S.S. (2018) How Logistics Performance is Affected by Supply Chain Relationships. The International Journal of Logistics Management, 29, 284-307.
https://doi.org/10.1108/IJLM-09-2016-0204
[70] Famiyeh, S. and Kwarteng, A. (2018) Supplier Selection and Firm Performance: Empirical Evidence from a Developing Country’s Environment. International Journal of Quality & Reliability Management, 35, 690-710.
https://doi.org/10.1108/IJQRM-06-2016-0091
[71] Das, D. (2018) The Impact of Sustainable Supply Chain Management Practices on Firm Performance: Lessons from Indian Organizations. Journal of Cleaner Production, 203, 179-196.
https://doi.org/10.1016/j.jclepro.2018.08.250
[72] Li, W.Y., Chow, P.S., Choi, T.M. and Chan, H.L. (2016) Supplier Integration, Green Sustainability Programs, and Financial Performance of Fashion Enterprises under Global Financial Crisis. Journal of Cleaner Production, 135, 57-70.
https://doi.org/10.1016/j.jclepro.2016.06.048
[73] Kafetzopoulos, D., Gotzamani, K. and Skalkos, D. (2019) The Relationship between EFQM Enablers and Business Performance: The Mediating Role of Innovation. Journal of Manufacturing Technology Management, 30, 684-706.
https://doi.org/10.1108/JMTM-06-2018-0166
[74] Ekici, A. (2013) An Improved Model for Supplier Selection under Capacity Constraint and Multiple Criteria. International Journal of Production Economics, 141, 574-581.
https://doi.org/10.1016/j.ijpe.2012.09.013
[75] Kar, A.K. and Pani, A.K. (2014) Exploring the Importance of Different Supplier Selection Criteria. Management Research Review, 37, 89-105.
https://doi.org/10.1108/MRR-10-2012-0230
[76] Minh, K.S., Zailani, S., Iranmanesh, M. and Heidari, S. (2019) Do Lean Manufacturing Practices Have Negative Impact on Job Satisfaction? International Journal of Lean Six Sigma, 10, 257-274.
https://doi.org/10.1108/IJLSS-11-2016-0072
[77] Liu, Y., Huang, Y., Luo, Y., Zhao, Y. (2012) How Does Justice Matter in Achieving Buyer-Supplier Relationship Performance? Journal of Operations Management, 30, 355-367.
https://doi.org/10.1016/j.jom.2012.03.003
[78] Sillanpaa, I., Shahzad, K. and Sillanpaa, E. (2015) Supplier Development and Buyer-Supplier Relationship Strategies—A Literature Review. International Journal of Procurement Management, 8, 67-90.
https://doi.org/10.1504/IJPM.2015.066283
[79] Alkunsol, W.H., Sharabati, A.A., AlSalhi, N.A. and El-Tamimi, H.S. (2018) Lean Six Sigma Effect on Jordanian Pharmaceutical Industry’s Performance. International Journal of Lean Six Sigma, 10, 23-43.
https://doi.org/10.1108/IJLSS-01-2017-0003
[80] ACI (2019) Amman Chamber of Industry. http://www.aci.org.jo/page/industrial_ directory.aspx.
[81] Sekaran, U. and Bougie, R. (2010) Research Methods for Business: A Skill Building Approach. 5th Edition, John Wiley & Sons Ltd., West Sussex.
[82] Salhieh, L., Altarazi, S. and Abushaikha, I. (2018) Quantifying and Ranking the “7-Deadly” Wastes in a Warehouse Environment. The TQM Journal, 31, 94-115.
https://doi.org/10.1108/TQM-06-2018-0077
[83] Rea, L. and Parker, A. (2014) Designing and Conducting Survey Research: A Comprehensive Guide. 4th Edition, John Wiley & Sons, Inc., Jossey-Bass, CA.
[84] Haier Jr., J., Black, W., Babin, B. and Anderson, R. (2014) Multivariate Data Analysis. 7th Edition, Pearson Education Ltd., Harlow.
[85] Litwin, M.S. (1995) How to Measure Survey Reliability and Validity. Sage Publications, Inc., Thousand Oaks, CA.
https://dx.doi.org/10.4135/9781483348957
[86] Nunnally, J.C. and Bernstein, I.H. (1994) Psychometric Theory. 3rd Edition, McGraw-Hill, Inc., New York.
[87] George, D. and Mallery, P. (2010) SPSS for Windows Step by Step: A Simple Guide and Reference 17.0 Update. 4th Edition, Allyn & Bacon, Boston, MA.
[88] Armstrong, R. and Tan, S. (2000) Corporate-Customer Satisfaction in the Banking Industry of Singapore. International Journal of Bank Marketing, 18, 97-111.
https://doi.org/10.1108/02652320010339617
[89] Hooper, D., Coughlan, J. and Mullen, M. (2008) Structural Equation Modeling: Guidelines for Determining Model Fit. Electronic Journal of Business Research Methods, 6, 53-60.
https://doi.org/10.21427/D7CF7R
[90] Byrne, B.M. (2016) Structural Equation Modeling with AMOS: Basic Concepts, Applications, and Programming, Routledge, London.
[91] Berenson, M.L., Levine, D.M. and Szabat. K.A. (2015) Basic Business Statistics: Concepts and Applications. 13th Edition, Pearson Education Ltd., Essex, England.
[92] Al-Hyari, K., Abu Hammour, S., Abu Zaid, M.K.S. and Haffar, M. (2016) The Impact of Lean Bundles on Hospital Performance: Does Size Matter? International Journal of Health Care Quality Assurance, 29, 877-894.
https://doi.org/10.1108/IJHCQA-07-2015-0083

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.