"A Cross Entropy-Genetic Algorithm for m-Machines No-Wait Job-ShopScheduling Problem"
written by Budi Santosa, Muhammad Arif Budiman, Stefanus Eko Wiratno,
published by Journal of Intelligent Learning Systems and Applications, Vol.3 No.3, 2011
has been cited by the following article(s):
  • Google Scholar
  • CrossRef
[1] Developing cross entropy genetic algorithm for solving Two-Dimensional Loading Heterogeneous Fleet Vehicle Routing Problem (2L-HFVRP)
2018
[2] Job shop scheduling with a combination of four buffering constraints
2017
[3] Solving multi-product inventory ship routing with a heterogeneous fleet model using a hybrid cross entropy-genetic algorithm: a case study in Indonesia
2016
[4] Using Multiobjective Genetic Algorithm and Multicriteria Analysis for the Production Scheduling of a Brazilian Garment Company
2013
[5] On-line Handwritten English Character Recognition Using Genetic Algorithm
population, 2013
[6] A Development of Hybrid Cross Entropy-Tabu Search Algorithm for Travelling Repairman Problem
B Santosa, M Aminuddin - iieom.org, 2012
[7] SIMPLE ITERATIVE MUTATION ALGORITHM FOR THE TRUCK SCHEDULING PROBLEM IN A CROSS DOCKING ENVIRONMENT
2012
[8] A Cross Entropy-Genetic Algorithm Approach for Multi Objective Job Shop Scheduling Problem
B Santosa, L Nurkhalida - iieom.org, 2012
[9] Genetic Algorithms for Perceptual Codes Extraction
Journal of Intelligent Learning Systems and Applications, 2012
[10] ALGORITHM PERFORMANCE COMPARISON OF CROSS ENTROPY (CE) AND ALGORITHM PARTICLE SWARM OPTIMIZATION (PSO) ON COMPLETION ISSUES FLOWSHOP SCHEDULING
Jurnal Ilmiah Dinamika Teknik, 2011
[11] Scheduling optimization of manufacturing systems with no-wait constraints
2011
[12] ALGORITHM PERFORMANCE COMPARISON OF CROSS ENTROPY (CE) AND ALGORITHM PARTICLE SWARM OPTIMIZATION (PSO) ON COMPLETION ISSUES …
2011