[1]
|
Automated Management of Time Extension Claims
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,
2024
DOI:10.1061/JLADAH.LADR-1104
|
|
|
[2]
|
Increasing the potential application of Microsoft project and Primavera P6 for project management: A comparative analysis of the residential project
Materials Today: Proceedings,
2023
DOI:10.1016/j.matpr.2022.11.485
|
|
|
[3]
|
Automated Computer Vision-Based Construction Progress Monitoring: A Systematic Review
Buildings,
2022
DOI:10.3390/buildings12071037
|
|
|
[4]
|
Increasing the potential application of Microsoft project and Primavera P6 for project management: A comparative analysis of the residential project
Materials Today: Proceedings,
2022
DOI:10.1016/j.matpr.2022.11.485
|
|
|
[5]
|
Increasing the potential application of Microsoft project and Primavera P6 for project management: A comparative analysis of the residential project
Materials Today: Proceedings,
2022
DOI:10.1016/j.matpr.2022.11.485
|
|
|
[6]
|
An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing
Sustainability,
2021
DOI:10.3390/su13073975
|
|
|
[7]
|
A review of methods, techniques and tools for project planning and control
International Journal of Production Research,
2018
DOI:10.1080/00207543.2018.1524168
|
|
|