[1]
|
G. B. Wetherill and W. K. Chiu, “A Review of Acceptance Sampling Schemes with Emphasis on the Economic Aspect,” International Statistical Review, Vol. 43, No. 2, 1975, pp. 91-210.
|
[2]
|
S. Bisgaard, W. G. Hunter and L. Pallesen, “Economic Selection of Quality of Manufactured Product,” Technometrics, Vol. 26, No. 1, 1984, pp. 9-18.
|
[3]
|
D. Y. Golhar, “Determination of the Best Mean Contents for a Canning Problem,” Journal of Quality Technology, Vol. 19, No. 2, 1987, pp. 82-84.
|
[4]
|
H. Moskowitz and K. Tang, “Bayesian Variables Acceptance-Sampling Plans: Quadratic Loss Function and Step- Loss Function,” Technometrics, Vol. 34, No. 3, 1992, pp. 340-347.
|
[5]
|
R. L. Fink and T. M. Margavio, “Economic Models for Single Sample Acceptance Sampling Plans, No Inspection, and 100 Percent Inspection,” Decision Sciences, Vol. 25, No. 4, 1994, pp. 625-653.
|
[6]
|
M. S. Aminzadeh, “Bayesian Economic Variable Acceptance-Sampling Plan Using Inverse Gaussian Model and Step-Loss Function,” Communication in Statistics – Theory and Methods, Vol. 32, No. 5, 2003, pp. 961-982.
|
[7]
|
M. K. Lee, S. H. Hong and E. A. Elsayed, “The Optimum Target Value under Single and Two-Stage Screenings,” Journal of Quality Technology, Vol. 33, No. 4, 2001, pp. 506-514.
|
[8]
|
M. K. Lee and E. A. Elsayed, “Process Mean and Screening Limits for Filling Processes under Two-Stage Scr- eening Procedure,” European Journal of Operation Research, Vol. 138, No. 1, 2002, pp.118-126.
|
[9]
|
H. M. Hsu, T. S. Su, M. -C. Wu and L. -C. Huang, “Multiple Lot-Sizing Decisions with an Interrupted Geometric Yield and Variable Production Time,” Computers and Industrial Engineering, Vol. 57, No. 3, 2009, pp. 699- 706.
|
[10]
|
R. H. Yeh, W. T. Ho and S.T. Tseng, “Optimal Production Run Length for Products Sold with Warranty,” European Journal of Operational Research, Vol. 120, No. 3, 2000, pp. 575-582.
|
[11]
|
M. Ben-Daya and M. Hariga, “Economic Lot Scheduling Problem with Imperfect Production Processes,” The Jour- nal of the Operational Research Society, Vol. 51, No. 7, 2000, pp. 875-881.
|
[12]
|
I. Moon, B. C. Giri and K. Choi, “Economic Lot Scheduling Problem with Imperfect Production Processes and Setup Times,” The Journal of the Operational Research Society, Vol. 53, No. 6, 2002, pp. 620-629.
|
[13]
|
C. H. Wang and S. H. Sheu, “Optimal Lot Sizing for Products Sold under Free-Repair Warranty,” European Journal of Operational Research, Vol. 149, No. 1, 2003, pp. 131-141.
|
[14]
|
C. H. Wang, “The Impact of a Free-Repair Warranty Policy on EMQ Model for Imperfect Production Systems,” Computers & Operations Research, Vol. 31, No. 12, 2004, pp. 2021-2035.
|
[15]
|
S. Anily, “Single-Machine Lot-Sizing with Uniform Yields and Rigid Demands: Robustness of the Optimal Solution,” IIE Transactions, Vol. 27, No. 5, 1995, pp. 625-633.
|
[16]
|
D. W. Pentico, “An Evaluation and Proposed Modification of the Sepehri-Silver-New Heuristic for Multiple Lot Sizing under Variable Yield,” IIE Transactions, Vol. 20, No. 4, 1988, pp. 360-363.
|
[17]
|
S. Anily, A. Beja and A. Mendel, “Optimal Lot Sizes with Geometric Production Yield and Rigid Demand,” Operations Research, Vol. 50, No. 3, 2002, pp. 424-432.
|
[18]
|
A. X. Zhang and S. M. Guu, “The Multiple Lot Sizing Problem with Rigid Demand and Interrupted Geometric Yield,” IEE Transactions, Vol. 30, No. 1, 1998, pp. 427- 431.
|
[19]
|
S. M. Guu and A. X. Zhang, “The Finite Multiple Lot Sizing Problem with Interrupted Geometric Yield and Holding Costs,” European Journal of Operational Res- earch, Vol. 145, No. 3, 2003, pp. 635-644.
|